My WebLink
|
Help
|
About
|
Sign Out
Home
2010-11-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2010
>
2010-11-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2011 8:54:04 AM
Creation date
11/19/2010 2:16:43 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/23/2010
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: November 23, 2010 Item No: 6 <br />Item Description: Dale Street Reconstruction Design <br />Background: <br />The Roseville City Council authorized the preparation of a Feasibility Report for the Dale Street <br />(County Road C to S. Owasso Blvd) Reconstruction project on August 9, 2010. Construction is <br />proposed for 2011. In the last 6 months, city staff has held four public information meetings <br />with residents living along Dale Street. The first meeting was on June 30, where we presented <br />the proposed reconstruction project and received input regarding neighborhood concerns along <br />the corridor. Among these were: Street design/ parking, pedestrian safety, drainage, traffic, <br />street lights, and undergrounding power lines. <br />The second meeting was on September 9, where we showed the residents a proposed street <br />design. This design included an 8 foot wide detached bituminous pathway along the east side of <br />the street, along with a parking lane along the west side of the street for the entire corridor. <br />On October 9, we had a "walk thru" meeting on site. This meeting started at County Road C and <br />continued north toward S. Owasso Blvd. It was a meeting in motion. The City surveyor marked <br />the location of the new curb and pathway, allowing staff to be able to meet with residents <br />individually to discuss the project and show them how it would impact the road in front of their <br />property. <br />Our final information meeting was on November 18. At that meeting, we presented the <br />preliminary staff recommendations including project cost and proposed assessments for the <br />project. We also presented the proposed roadway design. <br />The Feasibility Report will be presented to the City Council in December, with a Public Hearing <br />on January 10, 2011. Staff will walk through the preliminary plans at the meeting next week. <br />Additional information, including meeting presentations and preliminary plans are on the project <br />website: www .cityofroseville.com/dalestreet <br />Recommended Action: <br />Discuss Dale Street Reconstruction project. <br />Attachments: <br />A. None <br />
The URL can be used to link to this page
Your browser does not support the video tag.