My WebLink
|
Help
|
About
|
Sign Out
Home
2010-11-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2010
>
2010-11-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2011 8:54:04 AM
Creation date
11/19/2010 2:16:43 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/23/2010
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment <br />and Transportation Commission <br />Meeting Minutes <br />Tuesday, October 26, 2010, at 6:30 p.m. <br />City Council Chambers, 2660 Civic Center Drive <br />Roseville, Minnesota 55113 <br />1. Introduction Call Roll <br />Chair DeBenedet called the meeting to o <br />Members Present: Chair Jim DeBenedet <br />Vanderwall; Dwayne <br />.tubers Steve Gj erdingen; Jan <br />d; and Joan Felice <br />Staff Present: Public Works Director Duane Schwartz; Community <br />Development Director Patrick Trudgeon <br />2. Public Comments <br />None. <br />3. Approval of September 28, 2010 Meeting Minutes <br />Member Vanderwall moved, Member Stenlund seconded, approval of the <br />September 28, 2010 meeting as amended. <br />Arections <br />Page 2 2 nd Paragraph (Felice) <br />Typographical correction: "egress" <br />Page 2, 3 rd Paragraph (DeBenedet, Felice and Gj erdingen) <br />Correct to read: "Further discussion included an update of the Fairview <br />Avenue pathway project, now entering its final design stage; and working <br />through profile, easement and cost issues with the State of MN for value <br />engineering bids yet this fall and anticipated early spring 2011 construction. <br />Further discussion included the need for included the need for follow- through <br />for completion and /or removal of perimeter control drainage and culvert work <br />on Victoria Street; and drainage materials adjacent to Prince of Peace <br />Lutheran Church." <br />Page 9, Item 10, 2nd Para rgT (Felice) <br />Typographical correction: "affects" <br />Paae 9. Item 11. 1 St baraLarabh (Felice) <br />Typographical correction: "evidenced" <br />Page 10, 1 St incomplete paragraph (Felice <br />at approximately 6:30 <br />Page 1 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.