My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1400
Roseville
>
City Council
>
City Council Ordinances
>
1400
>
ord_1400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2011 10:43:23 AM
Creation date
1/3/2011 4:33:13 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
11/22/2010
Ordinance #
1400
Ordinance Title
AN ORDINANCE ADOPTING THE 2011 FEE SCHEDULE
Ordinance Date Passed
11/22/2010
Publication Type
Ordinance
Publication Title
2011 Fee Schedule
Publication Newspaper
Review
Publication Date (lst)
11/30/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2011 Fee Schedule <br /> Manufactured Home Permit Fee: <br /> Description Current .amount Proposed Amount <br /> New installation 250.00 257.50 <br /> Mechanical Permit Fee Residential: <br /> Description Current Amount Proposed Amount <br /> Air conditioning new 43.00 44.50 <br /> Air conditioning replacement 55.00 56.50 <br /> Warm air furnace new 91.00 94.00 <br /> Warm air furnace replacement 55.00 .56.50 <br /> Hot water boilers new 91.00 94.00 <br /> Hot water boilers replacement 55.00 56.50 <br /> Unit heaters 55.00 56.50 <br /> Swimming pool heaters 55.00 56.50 <br /> Misc. work gas piping 1.25% of job cost 1.28% of job cost <br /> Minimum fee 55.00 56.50 <br /> Gas fireplace 55.00 56.50 <br /> In floor heat 55.00 76.50 <br /> $1.28 of job cost <br /> Solar panel installation $150.00 min fee <br /> Mechanical Permit Fee Commercial: <br /> Description Current Amonnt Proposed Amount <br /> 1.28% of job cost <br /> All commercial work 1.25% of job cost $56.50 min fee <br /> Moving Permit Fee: <br /> Description Current .Amount Proposed Amount <br /> Over private property only 83.00 $85.50 <br /> Over public streets 121.00 125.00 <br /> Investigation fee per hour $62.00 $63.55 <br /> Plumbing Permit Fee: <br /> Description Current Amount Proposed Amount <br /> Administrative /minimum fee 55.00 56.50 <br /> Additional for each fixture opening 9.75 10.00 <br /> Miscellaneous work 1.25% of job cost 1.28% of job cost <br /> Backflow prevention verification 24.50 26.00 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.