Laserfiche WebLink
City of Roseville 2011 Fee Schedule <br /> Electrical Permit Fees <br /> A. Minimum fee for each separate inspection of an installation, replacement, <br /> alteration or repair is limited to one inspection only: <br /> Current Amount Proposed .amount <br /> 35.00 35.00 <br /> B. Services, changes of service, temporary services, additions, alterations or repairs <br /> on either primary or secondary services shall be computed separately: <br /> Description Current Amount Proposed Amount <br /> 0 to 300 amp $50.00 50.00 <br /> 301 to 400 amp 58.00 58.00 <br /> 401 to 500 amp 72.00 72.00 <br /> 501 to 600 amp 86.00 86.00 <br /> 601 to 800 amp 114.00 114.00 <br /> 801 to 1,000 amp 142.00 142.00 <br /> 1,001 to 1,100 amp 156.00 156.00 <br /> 1,101 to 1,200 amp 170.00 170.00 <br /> Add $14 for each add'l 100 amps <br /> C. Circuits, installation of additions, alterations, or repairs of each circuit or sub <br /> feeder shall be computed separately, including circuits fed from sub feeders and <br /> including the equipment served, except as provided for in (D) through (K): <br /> Description Current Amount Proposed :Amount <br /> O to 30 amp 8.00 8.00 <br /> 31 to 100 amp 10.00 10.00 <br /> 101 to 200 amp 15.00 15.00 <br /> 201 to 300 amp 20.00 20.00 <br /> 301 to 400 amp 25.00 25.00 <br /> 401 to 500 amp 30.00 30.00 <br /> 501 to 600 amp 35.00 35.00 <br /> 601 to 700 amp 40.00 40.00 <br /> Add $5 for each add'l 100 amps <br /> D. Maximum fee for single family dwelling shall not exceed $150.00 if not over <br /> 200 ampere capacity. This includes service, feeders, circuits, fixtures and <br /> equipment. The maximum fee provides for not more than two rough -in <br /> inspections and the final inspection per dwelling. Additional inspections are at <br /> the re- inspection rate. <br /> 17 <br />