My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1400
Roseville
>
City Council
>
City Council Ordinances
>
1400
>
ord_1400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2011 10:43:23 AM
Creation date
1/3/2011 4:33:13 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
11/22/2010
Ordinance #
1400
Ordinance Title
AN ORDINANCE ADOPTING THE 2011 FEE SCHEDULE
Ordinance Date Passed
11/22/2010
Publication Type
Ordinance
Publication Title
2011 Fee Schedule
Publication Newspaper
Review
Publication Date (lst)
11/30/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2011 Fee Schedule <br /> 0. For inspection of transient projects, including but not limited to, carnivals and <br /> circuses, the inspection fees shall be computed as follows: <br /> Power supply units according to Item `B" of fee schedule. A like fee <br /> will be required on power supply units at each engagement during the <br /> season, except that a fee of $35.00 per hour will be charged for <br /> additional time spent by the Inspector if the power supply is not ready <br /> for inspections as required by law. <br /> Rides, Devises or Concessions: Shall be inspected at their first <br /> appearance of the season and the inspection fee shall be $35.00 per unit. <br /> P. The fee is doubled if the work starts before the permit is issued. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.