Laserfiche WebLink
<br />C. COST OF EQUIPMENT HIRED: <br />T. A. Schifsky (Surfacing) <br /> <br />H. Angel (Pregrading) <br /> <br />$1,352.14 <br /> <br />724.50 <br />$2,076.64 <br /> <br />D. SUPERVISORY COSTS: <br />Consultants <br /> <br />$ 52 . 50 <br /> <br />Village Engineering <br /> <br />555.22 <br />$ 607.72 <br /> <br />E. OTHER: <br />Contract for Curb & Gutter <br /> <br />legal Publications <br /> <br />$1,757.21 <br /> <br />53.26 <br />$1,810.47 <br /> <br />GRAND TOTAL <br /> <br />$9,173.82 <br /> <br />I further certify that there were no deviations from the plans <br /> <br />and specifications except the following: <br /> <br />The addition of concrete curb and gutter along the <br />West Side of Arthur Place authorized by the Village <br />Council on July 28, 1961, by Resolution No. 466, <br />which costs are included above. <br /> <br />Respectfully submitted, <br /> <br />/}~ / .-- ) / . .,.u. /~/ ,,/ <br />~0~~--'" - ;;Ur:Ut;C>"" . ) <br />Chas. H. Sautter, Jr., P~'" <br />Village Engineer c:..>' " ' <br /> <br />CHS:mes <br />