My WebLink
|
Help
|
About
|
Sign Out
Home
res_942
Roseville
>
City Council
>
City Council Resolutions
>
00xxx
>
900
>
res_942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:09:36 AM
Creation date
4/23/2005 5:30:04 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
942
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Extract of Minutes of Meeting of the <br />village Council of the Village of Roseville <br />Ramsey County, Minnesota <br /> <br />Pursuant to due call and notice thereof, a regular meeting <br /> <br />of the Village Council of the Village of Roseville, Minnesota, <br /> <br />was duly held at the Village Hall in said village on Monday, <br /> <br />the 6th day of April, 1964, at 7:30 o'clOCK P.M. <br /> <br />The following members were present: Cedarholm, Curley, <br /> <br />Goodrich, Grauel & S1-.iclds <br /> <br />and the followin-j ',.ere 3.bsent: <br /> <br />None <br /> <br />Shields introducec the following resolution and moved its <br /> <br />adoption: <br /> <br />KESOLUTION NO. 942 <br />!~SOLUTION APPROVING ENGINEERS PKELIMINARY <br />KEPORT AND PROVIDING FOR PUBLIC HEARING ON <br />wATER IMPROVEMENT NO. 64-5 <br /> <br />BE IT RESOLVED by the Council of the Village of Roseville <br /> <br />as follows: <br /> <br />1. The Council has heretofore directed Banister Engineer- <br />ing Co. to prepare a preliminary report as to the feasibility <br />of a proposed improvement consisting of the construction of <br />facilities needed for distributing water within a substantial <br />area of the Village, as described in the notice set forth below, <br />and the estimated cost thereof, and as to whether such improve- <br />ment should best be made as proposed or in connection with some <br />other improvement. The preliminary report and cost estimate <br />have been submitted by the engineers and considered by the <br />
The URL can be used to link to this page
Your browser does not support the video tag.