My WebLink
|
Help
|
About
|
Sign Out
Home
2004_1220_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_1220_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 1:43:06 PM
Creation date
2/7/2011 12:30:52 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it is currently defined, contains appro�mately 108 acres, or appro�mately 60% of the total Twin <br />Lakes RedevelopmentArea. (Refer to Ryan DevelopmentArea Map). <br />The City must provide a notice of the intent to pursue development of the property within the <br />subdistt`ict and is required by its e�sting agreement with Ryan Companies to provide Ryan witll tlle <br />right of first offer to enter into a development agreement for the property. This applies to any <br />development witllin the Twin Lakes Development Subdistrict where 10% or more of the new <br />development is proposed to be office, medical, showroom or otller light industrial developmen� If <br />the City receives an offer for development from any other developer, the City, before accepting that <br />offer, must offer the same agreement to Ryan Companies for development of the same property � no <br />less favorable terms and conditions tl�an 1��ose contained in the agreement with anotllerparty. Ryan <br />Companies then has 20 business days to accept the agreement (if tlley l�ave secur�ed control or <br />ownership of the property). If Ryan fails to exercise its first right witllin 20 days, its rights are <br />deemed waived and the City can pursue developmentwith the other developer. The fixst offer rights <br />in the agreement nm until November 24,2003 . If the City fails to notify the developer m writing 60 <br />days prior to that date of expiration, tllen the expiration date is automatically extended to November <br />24,2008. <br />Actual development which has occurred to date includes the construction of a 48,000-square-foot <br />office-flex building, a 74,500 s.f. office-flex building, a 66,000 s.£ medical office buildiig, a 35,000 <br />s.f. office-flex building and a 105,000 s.f, office-flex buildiig. It is estimated tl�t these developments <br />have generated over 1,150 jobs with an annual payroll of appro�mately $27 million and $850,000 in <br />ar�al property taxes. In the future, and based on the new development to date, when the <br />redevelopmentof the Twin Lakes RedevelopmentArea i s complete, the hucking and outdoor storage <br />gradually will be replaced by a more contemporary miY of high quality office, medical facilities, <br />limited light industrial and office/showroom buildings, complementary commercial businesses and <br />multiple housing witll a focus on the natural environmental amenities adj acent to the area. <br />The'Iinr�n Lakes RedevelopmentArea Renewal St�tegy includes up to 3.0 million square feet of new <br />or refurbished buildings. This additional square footage �m the tota12.1 million outlined 'm the <br />1996 plan is due to the added parcels and proposal for multiple-level developments. The <br />implementation is expected to be at market-drivenrateswith developmentbeginningas early as 2002 <br />until fUll development is reached around 2020. (Several parrcels that lie within the project bounda�ies <br />have �r�dy been redeveloped or are being const�ucted, with all governmental decisions »urde for <br />those project�) <br />The proj ect also includes the use of tax increment financing when available to aid in construction of <br />the Twin Lakes Parkway, a twalane road with landscapedmedians, left and right turning lanes, and <br />landscaped boulevards. Direct access from Twin Lakes Parkway to and from northbound I-35W will <br />be provided Through staging, this street will connect to and provide right-in, right-out access to <br />Snel�ing Avenue on the east side of the proj ectarea cflnsistent witll the original transportation plan of <br />1988. <br />The Parkway is needed to provide proper access to interior parcels, to accommodate future traffic <br />generatedwithin the site, and to improve levels of service and capacity restraints on e�sting local and <br />regional roadways around tlle proj ect area, including County Road C, Cleveland Avenue and Fairview <br />Avenue. <br />fL <br />
The URL can be used to link to this page
Your browser does not support the video tag.