Laserfiche WebLink
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />Move this section of the code to 803.04. <br />1. Calculations: any that were made for the design of such items as sediment <br />basins, diversions, waterways, and other applicable practices <br />1017.05: PLAN REVIEW OF PLAN: <br />1) General. The City appoints the City Engineer to review the erosion and sediment <br />control plan to ensure compliance with the City of Roseville Erosion and Sediment <br />Control SpccificationsStandards. <br />2) Permit required. If the City determines that the erosion and sediment control plan <br />meets the requirements of this article, the City shall issue a permit, valid for a <br />specified period of time that authorizes the land disturbance activity contingent on the <br />implementation and completion of the erosion and sediment control plan. <br />3) Denial. If the City determines that the erosion and sediment control plan does not <br />meet the requirements of this article, the City shall not issue a permit for the land <br />disturbance activity. The erosion and sediment control plan must be resubmitted for <br />approval before the land disturbance activity begins. No land use and building <br />permits may be issued until the Permittee has an approved erosion and sediment <br />control plan. <br />4) Permit suspension. If the City determines that the approved plan is not being <br />implemented according to the schedule or the control measures are not being properly <br />maintained, all land use and building permits must be suspended and stop work order <br />issued until the Permittee has fully implemented and maintained the control measures <br />identified in the approved erosion and sediment control plan. <br />1017.06: PLAN IMPLEMENTATION AND MAINTENANCE-OF-PLAN: <br />All storm water pollution controls noted on the approved erosion and sediment control plan shall <br />be installed before commencing the land disturbing activity, and shall not be removed without <br />City approval or issuance of aapproval of a Certificate of Completion. Noncompliance with tho <br />grading and erosion control plan shall constitute grounds for an order from the City to halt all <br />construction. <br />Thc plan implementation shall incorporate the following: <br />1) Existing vegetation shall bo retained whenever feasible. <br />2) Land shall be disturbed in increments of workable size on which adequate erosion <br />and sediment control can be provided and maintained, and staged so that the arca is <br />not oxposod for long periods of time without stabilization. <br />3) Thc location of areas not to be disturbed must be identified with flags, stakes, signs, <br />1) Down gradient sediment controls must bo in place before up gradient land disturbing <br />activity begins. <br />5)Black z' term silt fence installation. <br />6)All storm drains and inlets must be protected until all sources of potential discharge aro <br />stabilized. <br />uurfaco waters or storm water convoyanco systems. <br />5 <br />