Laserfiche WebLink
*BMP Title: Procedure for Site Plan Review <br />*BMP Description: <br />Plan review procedures are identified in City ordinances, which require submittal, review and approval of required <br />permit applications. Design standards and timelines for review are provided in the ordinance. The City uses this <br />regulatory mechanism to ensure post construction runoff control compliance with the approved Surface Water <br />Management Plan. Final approval by the City Engineer is required, as well as compliance with the City's <br />Comprehensive Surface Water Management Plan (CSWMP), National Urban Runoff Program (NURP) and the <br />standards established by MPCA in their publication "Urban Best Management Practices." <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />*Measurable Goals: <br />Number of plans reviewed <br />Number of resulting BMPs <br />*Timeline/Implementation Schedule: <br />Currently in place and will continue annually <br />Specific Components and Notes: <br />*Responsible Party for this BMP: <br />Name: Debra Bloom <br />Department: Public Works <br />Phone: 651- 792 -7042 <br />E -mail: deb.bloom @ci.roseville.mn.us <br />*Indicates a REQUIRED field. Failure to complete any required field will result in rejection of the application due <br />to incompleteness. <br />wq strrn4 50 <br />Minimum Control Measure: <br />BMP Summary Sheet <br />MS4 Name: City of Roseville <br />Unique BMP Identification Number: 4d -1 <br />4- CONSTRUCTION SITE STORMWATER RUNOFF <br />CONTROL <br />