Laserfiche WebLink
*BMP Title: Inspection Follow -up Including the Determination of Whether Repair, Replacement, or <br />Maintenance Measures are Necessary and the Implementation of the Corrective Measures <br />*BMP Description: <br />The City currently conducts inspection of the storm conveyance system and any ancillary appurtenances not <br />covered by other inspections on an annual basis and makes repairs and replacements if necessary. <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />*Measurable Goals: <br />Storm water conveyance system inspection completed (y /n) <br />Documentation of maintenance actions completed (y /n) <br />*Timeline/Implementation Schedule: <br />Currently in place and will continue annually <br />Specific Components and Notes: <br />*Responsible Party for this BMP: <br />Name: Steve Zweber <br />Department: Public Works <br />Phone: 651- 792 -7052 <br />E -mail: steve.zweber @ci.ros eville.mn.us <br />MS4 Name: <br />Minimum Control Measure: <br />Unique BMP Identification Number: <br />*Indicates a REQUIRED field. Failure to complete any required field will result in rejection of the application due <br />to incompleteness. <br />wq- stom4 -50 <br />BMP Summary Sheet <br />City of Roseville <br />6- POLLUTION PREVENTION /GOOD HOUSEKEEPING <br />6b -5 <br />