Laserfiche WebLink
2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />Move this section of the code to 803.04. <br />8)Vchicle tracking from thc site shall be minimized with the use of stone pads, concrete or <br />stool wash racks, or equivalent systems. <br />9)Stroet swooping must bo used if BMPs aro not adequate to prevent sediment from boing <br />tracked into the street. <br />The Permittee shall be responsible for proper operation and maintenance of all stormwater <br />pollution controls and soil stabilization measures in conformance with best management <br />practices and with the maintenance requirements in the NPDES General Construction Permit. <br />The Pormittee is responsible for tho operation and maintenance of temporary orosion at the situ. <br />The Permittee is responsible until another Permittee has assumed control over all areas of the site <br />that have not been finally stabilized or the site has undergone final stabilization, and has received <br />an approved Certificate of Completion. The Permittee is responsible for maintenance, clean-up <br />and all damages caused by flooding of the site or surrounding area due to in -place erosion er-and <br />sediment control. <br />1017.07: MODIFICATION OF PLAN: <br />An approved erosion and sediment control plan may be modified on submission of an application <br />for modification to the City and subsequent approval by the City Engineer. In reviewing such <br />application, the City Engineer may require additional reports and data. <br />1017.08: ESCROW REQUIREMENT: <br />After approval of an erosion and sediment control plan, the City shall require the Permittee to <br />escrow a sum of money sufficient to ensure the inspection, installation, completion and <br />maintenance, and completion of the erosion and sediment control plan and practices. Escrow <br />amounts shall be set from time to time by the City Council. Upon project completion, the <br />remaining escrow shall be returned to the Permittee. <br />The City shall notify the Permittee when the City is going to act on the financial securities. <br />1017.09: <br />ENFORCEMENT: <br />I. <br />14I <br />1) Corrective Work. If the City determines the erosion and sedimentation control is not <br />being implemented or maintained according to the approved plan, the Permittee will <br />be contacted and provided with a list of corrective work to be performed. This work <br />shall be completed forty -eight (48) hours after notification by the City. <br />The City shall notify tho Pormittoo whon tho City is going to act on the financial <br />securities part of this ordinance. <br />1)Notification by the City. Tho initial contact will bo to a party or parties listed <br />on tho application and /or the storm water pollution control plan. Forty oight <br />(18) hours after notification by the City or seventy two (72) hours after thc <br />6 <br />