My WebLink
|
Help
|
About
|
Sign Out
Home
2010-08-26_Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Minutes
>
201x
>
2010
>
2010-08-26_Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 12:07:03 PM
Creation date
4/27/2011 12:06:18 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
8/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2, 1 Bullet Point <br />Separate out the last two (2) sentences of the first bullet point as a separate bullet <br />Page 2, Correction of the date for receipt of the GLWMO 3 Generation Plan <br />Proposal Length/Ancillary Material/Types of Copies to be Submitted <br />Proposals will be limited to twelve (12) pages. <br />"Ancillary material must be included in appendices and will not count toward the <br />twelve (12) page limit for the proposal." <br />Each proposer will provide ten (10) hard copies and one (1) electronic copy in PDF <br />format, to be delivered to the official GLWMO address. <br />Page 3, Groundwater Contamination New Bullet Point #5 <br />"The Plan will provide an updated and proactive vision for groundwater development <br />plans at local and state levels." <br />Motion (as revised) <br />Ayes: 5 <br />Nays: 0 <br />Motion carried. <br />Chair Ferrington thanked members for their valuable d <br />lengthy process. <br />NEW BUSINESS <br />Develop and Approve Mechanism for Dissemination of RFP AND <br />Assemble List of Prospective Contractors for Dissemination of RFP <br />Chair Ferrington provided as bench handouts, attached hereto and made a part thereof a <br />proposed timeline for developing the 3` Generation Watershed Management Plan for the <br />GLWMO; and a list of proposed firms for circulation of the RFP. <br />Discussion included the timeline and revisions needed following tonight's discussion, with Chair <br />Ferrington volunteering to e -mail updated timelines to Members; firms listed, their <br />qualifications, and additional firms to consider to achieve a good response; and whether to <br />restrict dissemination. <br />Mr. Maloney noted that, when the 2 Generation Plan was done, the Board short- listed the <br />number of firms based on the firm's capabilities and Board judgments. <br />Chair Ferrington provided a short list of 10 firms, including of the names of the four (4) firms <br />having expressed interest already. These firms and other suggested by Board members could be <br />contacted sent the RFP, and that the RFP should also be put on the website as a public document. <br />7 <br />scuss <br />on and patience throughout this <br />
The URL can be used to link to this page
Your browser does not support the video tag.