My WebLink
|
Help
|
About
|
Sign Out
Home
2011-02-10_Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Minutes
>
201x
>
2011
>
2011-02-10_Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2011 1:57:20 PM
Creation date
4/27/2011 2:03:52 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
2/10/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Management Plan. It was unanticipated that the four map figures contained in the 2001 <br />version of the Plan were no longer available because the technology utilized to create <br />these figures is not compatible with the current mapping technology. To include and <br />update the four maps contained in the 2001 version of the Plan, as required by State rules, <br />will require additional data and GIS work at a cost of $1,505. Member Miller questioned <br />whether the GLWMO will own the data and GIS files need to produce the new maps. <br />Camilla Correll of EOR stated that the data will be the property of the GLWMO. <br />Motion 11 -02 -02 <br />Member Miller moved, Member Westerberg second Approve reimbursing EOR for the <br />added costs of generating 4 new map figures for the 3rd Generation Watershed <br />Management Plan in the amount of $1,505.00. All voted in favor. <br />Date for the 3rd Special Stakeholders' Meeting <br />Chair pro tem Eckman explained that the previously established tentative date for the 3rd <br />Special Stakeholders' Meeting must be changed from March 10 to March 22 because <br />EOR staff is unavailable on the 10th. <br />Motion 11 -02 -03 <br />Moved by Member Miller, second by Member Westerberg Change the 3 rd Special <br />Stakerholders's meeting to Tuesday, March 22 2011 from 3:30 pm to 6:30 pm at the <br />Roseville City Hall. All voted in favor. <br />Impaired waters Status for Lake Judy and Lake Emily <br />Chair pro tem Eckman explained that an opportunity exists to secure MPCA funds to <br />perform watershed assessments and TMDL studies for Lake Judy and Lake Emily if the <br />GLWMO acts at this meeting. Andrea Plevan from EOR explained the program, <br />currently being offered by the MPCA, to perform TMDL studies for water resources <br />suspected as being "Impaired" for nutrients. Preliminary data shows that Lakes Emily <br />and Judy will show impairment for nutrients. It was determined that the GLWMO should <br />take advantage of this opportunity to leverage State funding for the necessary analysis of <br />the aforementioned Lakes. Member Westerberg suggested that Lake Owasso be added to <br />the MPCA study request because of its hydrologic connection to the mentioned Lakes <br />and the high probability that Owasso may also be impaired for nutrients. <br />Motion 11 -02 -04 <br />Member Miller moved, second by Member Westerberg Pursue funding from the MPCA <br />for complete TMDL studies for Lake Judy, Lake Emily, and Bennett Lake, and for a <br />complete watershed assessment to provide protection measures for Lake Owasso. All <br />voted in favor. <br />Motion 11 -02 -05 <br />Member Miller moved, second by Member Westerberg- to adjourn the meeting at 3:15 <br />PM. All voted in favor. <br />Minutes respectfully submitted by Tom Petersen, GLWMO Administrator, Feb. 14, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.