My WebLink
|
Help
|
About
|
Sign Out
Home
2011-05-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2011
>
2011-05-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2011 10:10:11 AM
Creation date
5/24/2011 9:51:39 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/24/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R9P 4 SEVILLE <br />Project Summary <br />The City's Contractor will be starting work the week <br />of May 9 on the following street segments: <br />Parker Avenue (Lexington Ave to Victoria Street) <br />Oakcrest Avenue (Cleveland Ave to Prior Ave) <br />Elmer Street (William St to Woodbridge St) <br />Garden Avenue (Hamline Ave to Lexington Ave) <br />The first thing the contractor will do is remove and <br />replace curb. The curbs are marked for removal <br />with white paint. <br />What follows is a schedule of when work should <br />start on the remaining streets in this project. <br />Please be aware that these schedules are weather <br />dependent, rain can cause delays. Check the <br />website for the most current information. <br />Week of May 29th: <br />Fisk Street (County Road C to Rose Place) <br />Rose Place (Fisk Street to Avon Street) <br />Hythe Street (Draper Street to Roselawn Ave) <br />Cohansey Blvd (Crescent Lane to Irene Street) <br />Week of June 5th: <br />Aladdin Street (Rose Place to Cul -de -sac) <br />Evergreen Court (Skillman Ave to cul- de- sac) <br />Sherren St (Fernwood Ave to Lexington Ave <br />Week of June 19th: <br />County Road C2 (Snelling Ave to Hamline Ave) <br />All work should be completed by September 2011. <br />Mill and Overlay projects typically take between 3 <br />to 5 weeks to complete. <br />Don't see your street? <br />If your street is not on the list above, you are <br />receiving this newsletter because this project will <br />impact how you access your neighborhood. <br />Aladdin Street Water Quality Improvements <br />The Contractor will be starting the pipe work for this <br />portion of the project late next week. The street <br />work will follow shortly thereafter. <br />Attachment A <br />2011 Pavement <br />Management Project <br />Volume 2 <br />May 6, 2011 <br />Milling of existing pavement on Centre Pointe Dr. <br />Private Systems behind curb <br />Curbs designated for repair are marked or will be <br />marked in the near future with white paint. <br />Sprinkler systems and invisible fences near curb <br />repairs will be affected. We recommend that you <br />mark the location of underground wires or <br />sprinklers immediately. Removal and reinstallation <br />of these items is the responsibility of the property <br />owner. Please remove these items from the city <br />right- of- way before work is scheduled to occur on <br />your street. If these items are not removed, the <br />contractor will damage them when they start <br />construction. The City will not pay to repair or <br />replace these systems. <br />Please contact Dean Findell, Project Coordinator, if <br />you have questions. <br />Project Contacts: <br />Dean Findell, Project Coordinator <br />(651) 792 -7046 <br />dean.findell(ao ci. roseville. mn. us <br />Deb Bloom, City Engineer <br />(651) 792 -7042 <br />deb.bloom ci.roseviile.mn <br />Check for construction updates at: www.cityofroseville.com/2011PMP <br />