My WebLink
|
Help
|
About
|
Sign Out
Home
2011-02-22_PWETC_Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Minutes
>
201x
>
2011
>
2011-02-22_PWETC_Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2011 11:12:06 AM
Creation date
5/27/2011 11:11:51 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
2/22/2011
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Josephine Woods <br />City Engineer Bloom revised an application received by the Community <br />Development Department from Pulte Homes for approval of 28 -unit single family <br />residential subdivision at Lexington Avenue and County Road C -2 in Roseville; <br />as detailed in the staff report dated February 22, 2011. Ms. Bloom noted that the <br />application would come before the Planning Commission at their March 2, 2011 <br />meeting and sought feedback from the PWET Commission on the development. <br />Ms. Bloom highlighted various components of the proposed development noting <br />that this would be the first subdivision to utilize the City's new Tree Preservation <br />Ordinance; wetland locations and their preservation under review by the Rice <br />Creek Watershed District (RCWD) under the State Conservation Act; proposed <br />public street locations, their revised configurations, and /or extensions; the five <br />lots proposed to access and their service lines off County Road C -2; twenty -six <br />(26) existing homes served by the existing Lake Josephine lift station and <br />proposed upgrades to facilitate some of the new homes; grading plans of the <br />preliminary plat; emergency storm water overland flows and other storm water <br />mitigation; and how the plans fit into the City's overall Pathway Master Plan. <br />Discussion with Members included verification of the width of the pathways (8') <br />where no current sidewalk existed and where it connected to existing segments; <br />identification of off -road facilities and coordination with private property owners <br />for local versus regional facilities at County Road C -2 for non motorized <br />transportation; the need to connect the pathway on the south side of County Road <br />C -2 where it dead -ends several feet before the tar near Hamline Ave; and the need <br />to recognized the value of remaining plats of land such as this to develop it in an <br />exemplary fashion and addressing environmental issues and green space to fit the <br />frame of mind of Roseville citizens. <br />Additional highlights provided by Ms. Bloom and discussed with Members <br />included plans and profiles for the proposed improvement with elevations and <br />goals preserving trees and green space; ensuring that preservation of trees be fully <br />addressed with the exception of those areas where stormwater management <br />requirements precluded preserving trees and as guided by the City's Subdivision, <br />stormwater and erosion control ordinances; and practicalities of building homes <br />on this challenging terrain with staff opining that the developer had done a <br />reasonable job in protecting and preserving those various green spaces in <br />recognizing that it added value to the properties as well. <br />Ms. Bloom, in addressing concerns of Members with storm water management <br />and the terrain, noted that the entire area would be within a stormwater <br />management plan and covered by a bio- filtration system for the twelve (12) <br />homes to be impacted, with no fences allowed and signs placed along the entire <br />stormwater easement to educate property owners. Ms. Bloom noted that there <br />would probably be individual maintenance agreements with each property owner <br />Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.