Laserfiche WebLink
Description <br />2012 <br />2013 <br />2014 <br />2015 <br />2016 <br />2017 <br />2018 <br />2019 <br />2020 <br />2021 <br />Total <br />2022 <br />2023 <br />2024 <br />2025 <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />2031 <br />Description <br />Type <br />2012 <br />2013 <br />2014 <br />2015 <br />2016 <br />2017 <br />2018 <br />2019 <br />2020 <br />2021 <br />Total <br />2022 <br />2023 <br />2024 <br />2025 <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />2031 <br />Pond improvements/infiltration <br />I <br />250,000 <br />300,000 <br />300,000 <br />300,000 <br />300,000 <br />300,000 <br />350,000 <br />350,000 <br />350,000 <br />350,000 <br />3,150,000 <br />400,000 <br />400,000 <br />400,000 <br />400,000 <br />450,000 <br />450,000 <br />450,000 <br />500,000 <br />500,000 <br />500,000 <br />Storm sewer replacement/rehabilitationP1413 <br />I <br />250,000 <br />300,000 <br />350,000 <br />350,000 <br />400,000 <br />400,000 <br />400,000 <br />450,000 <br />450,000 <br />450,000 <br />3,800,000 <br />500,000 <br />500,000 <br />500,000 <br />500,000 <br />500,000 <br />500,000 <br />500,000 <br />500,000 <br />500,000 <br />500,000 <br />Regenerative air sweeper (vacuum) <br />I <br />80,000 <br />213,950 <br />Leafsite water quality improvements <br />F <br />#132 Elgin sweeper 2002 3-wheel <br />V <br />600,000 <br />650,000 <br />#167 Elgin Sweeper 20063 -wheel <br />V <br />700,000 <br />191,000 <br />191,000 <br />218,000 <br />Self- propelled paver 1/4 share <br />E <br />25,000 <br />25,000 <br />Cement mixer <br />E <br />4,000 <br />#171 Tennant 6600 sweeper 1/4 share <br />V <br />8,000 <br />8,000 <br />9,000 <br />#163 Electronic message boerd(1 /4) <br />E <br />7,000 <br />7,000 <br />8,000 <br />$115 flail mower <br />E <br />25,000 <br />25,000 <br />25,000 <br />#139 Vacall <br />V <br />200,000 <br />200,000 <br />#130 Steamer "Amazing Meshing" <br />E <br />15,000 <br />15,000 <br />16,500 <br />#110 LCT 600 Leaf Machine <br />E <br />25,000 <br />25,000 <br />25,300 <br />#131 LCT 600 Leaf Machine <br />E <br />25,000 <br />25,000 <br />26,400 <br />#148 lct 600 Leaf Machine <br />E <br />25,960 <br />25,960 <br />#236 FT SA trailer 1/2 <br />E <br />2,500 <br />2,500 <br />3,000 <br />#158 ATL 4300 Trash Vacuum (1 /2) <br />V <br />20,000 <br />20,000 <br />16,500 <br />#237 Wacker Compactor 1/4 <br />E <br />8,000 <br />8,000 <br />8,800 <br />#601 Bobcat Skidsteer (1/4) 500 rental year <br />V <br />10,000 <br />10,000 <br />#172 Zero Tum Dixie Chopper <br />V <br />12,000 <br />12,000 <br />13,200 <br />#169 Toro Zero Turn Mower 1/4 share <br />V <br />5,000 <br />3,300 <br />8,300 <br />3,630 <br />#164 John Deere Turf Gater <br />V <br />10,000 <br />10,000 <br />12,000 <br />#168 Wildcat Compost Tumer <br />E <br />100,000 <br />100,000 <br />Update stovmwater mgmt plan <br />I <br />100,000 <br />100,000 <br />Field Computer Add/Rep lace eats <br />E <br />5,000 <br />5,000 <br />7,000 <br />628 Unit (1/3 share) <br />E <br />4,000 <br />4,000 <br />Control Panel with Aux power at St Croix <br />E <br />300,000 <br />300,000 <br />Portable Generator for St Croix (1/2 share) <br />E <br />80,000 <br />50,000 <br />#147 3-Ton Dumptruck <br />V <br />155,000 <br />155,000 <br />174,900 <br />#103 Ford 450 w/ Plow <br />V <br />65,000 <br />65,000 <br />71,500 <br />#145 3-Ton Dump w/ Plow <br />V <br />159,000 <br />159,000 <br />174,900 <br />#225 Cat Back -hoe (1 /2 wtr, 1/2 storm) <br />V <br />40,000 <br />40,000 <br />#211 360 Bacldsoe (1/3) <br />V <br />60,000 <br />60,000 <br />66,000 <br />#211360 Becldsoe (Grapple Bucket) <br />E <br />17,600 <br />#211360 Becldsoe (Sand Bucket) (1 /3) <br />E <br />3,000 <br />#1655 ton trailer 1 /2 <br />E <br />5,000 <br />5,000 <br />5,500 <br />#129 Leroi Air Compressor (1/3) <br />E <br />10,000 <br />Arone Stonn Station Upgrades <br />E <br />20,000 <br />Millwood Storm Station Upgrades <br />E <br />15,000 <br />100,000 <br />Owasso Hills Storm Station Upgrades <br />E <br />Walsh Stonn station Upgrades <br />E <br />45,000 <br />Replace/Upgrade SCADA I/3 <br />E <br />50,000 <br />50,000 <br />Total <br />840,000 <br />879,000 <br />1,048,000 <br />675,000 <br />1,025,960 <br />705,000 <br />941,000 <br />885,800 <br />956,000 <br />800,000 <br />8,685,760 <br />900,000 <br />1,137,450 <br />908,800 <br />1,126,130 <br />1,131,900 <br />962,000 <br />975,000 <br />1,248,800 <br />1,100,000 <br />1,213,600 <br />Description <br />2012 <br />2013 <br />2014 <br />2015 <br />2016 <br />2017 <br />2018 <br />2019 <br />2020 <br />2021 <br />Total <br />2022 <br />2023 <br />2024 <br />2025 <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />2031 <br />Land <br />Buildings <br />B <br />Vehicles <br />V <br />155,000 <br />184,000 <br />240,000 <br />10,000 <br />191,000 <br />78,300 <br />80,000 <br />938,300 <br />Equipment <br />E <br />80,000 <br />50,000 <br />158,000 <br />325,960 <br />2,500 <br />26,000 <br />642,460 <br />Furniture &Fixtures <br />F <br />Improvements <br />I <br />600,000 <br />600,000 <br />650,000 <br />650,000 <br />700,000 <br />700,000 <br />750,000 <br />800,000 <br />800,000 <br />800,000 <br />7,050,000 <br />Total <br />835,000 <br />834,000 <br />1,048,000 <br />660,000 <br />1,025,960 <br />700,000 <br />941,000 <br />880,800 <br />906,000 <br />800,000 <br />8,630,760 <br />2011 <br />2002 <br />2006 <br />2011 <br />2008 <br />2008 <br />1995 <br />1993 <br />2010 <br />1995 <br />1997 <br />2000 <br />2000 <br />2004 <br />2007 <br />2008 <br />2009 <br />2006 <br />2007 <br />1995 <br />1999 <br />2009 <br />2000 <br />1993 <br />2008 <br />1997 <br />City of Roseville <br />Capital Improvement Plan <br />2012 -2021 <br />CIP Storm Drainage <br />Summary by Type <br />