My WebLink
|
Help
|
About
|
Sign Out
Home
2011-06-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2011
>
2011-06-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2011 9:08:16 AM
Creation date
6/28/2011 8:53:24 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/28/2011
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Des Plaines Neighborhood Traffic Management Policy <br />Page 11 of 12 <br />rehabilitation or reconstruction of the street The removal of a measure does not <br />absolve the residences of complete payment of the previously incurred installation <br />costs. <br />If the neighborhood does not wish to wait until the next scheduled construction on <br />the street, then they may still have the measures removed. However, the residences <br />in the SSA must reimburse the City for its previous contribution to the installation of <br />the measures and fund the removal of the measures. An amendment to the SSA <br />must be filed following the same procedure used for initially creating the SSA, as <br />outlined in Step 4. <br />*Coordination between Traffic Calming Projects and Capital Improvement Program <br />During the Data Collection (Step 2), the City will review the current 5 -year Capital <br />Improvement Program (CIP) to see whether the subject street is scheduled for any <br />upcoming construction work. If the street is scheduled for upcoming work, there is <br />potential for any proposed traffic calming measures to be implemented as part of the larger <br />CIP project, resulting in a decreased cost to the residents. <br />Furthermore, if upcoming CIP work is scheduled for the subject street, the City reserves the <br />right to delay the installation of any traffic calming measures until that time. This is to <br />prevent the City from having to manage the construction of traffic calming measures, only to <br />have to potentially fund their reconstruction during the CIP work [Note: As per the "Project <br />Cost Share" table in the Funding Section of this policy, residents pay for the initial <br />construction, but the City then assumes the cost of future maintenance for any installed <br />measures]. <br />The coordination of traffic calming projects with CIP projects will be addressed on a case <br />by -case basis and will be coordinated with the Alderman and the petitioning residents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.