Laserfiche WebLink
Storm Drainage Operations <br /> The City provides for the management of storm water drainage to prevent flooding and pollution <br /> control, as well as street sweeping and the leaf pickup program. The following table provides a <br /> summary of the 2011 and 2012 (Proposed) Budget: <br /> 2011 2012 D• D• <br /> Personnel $318,653 $310,837 <br /> Supplies&Materials 52,201 55,301 <br /> Other Services&Charges 306,490 27700 <br /> Depreciation/Capital 1,10500 1,260,000 <br /> Total $ 1,782,344 $ 1,903,938 $ 121,594 6.8% <br /> The City expects to have moderate increases in supply and capital-related costs. These will be <br /> somewhat offset by lower personnel and other costs. <br /> The 20-Year CIP calls for an average capital replacement need of $972,000 annually. In contrast, <br /> current storm water rates only provide $310,000 annually. <br /> To alleviate this shortfall, the CIP Task Force recommended a one-time base rate increase of 65% in <br /> 2012. This would generate an additional $660,000 annually and allow the Storm Water Fund to <br /> provide for capital improvements over the next 20 years as well as increased operating costs. The base <br /> rate would still need to be increased for future inflationary impacts. <br /> Recycling Operations <br /> The recycling operation provides for the contracted curbside recycling pickup throughout the City. <br /> The primary operating cost is the amounts paid to a contractor to pickup recycling materials. The <br /> following table provides a summary of the 2011 and 2012 (Proposed) Budget: <br /> 2011 2012 D• D• <br /> Personnel $32,769 $31,581 <br /> Supplies&Materials 401 400 <br /> Other Services&Charges 23,410 24,910 <br /> Contract Pickup 43500 46800 <br /> Total $491,580 $524,891 $33,311 6.8% <br /> The City expects to have moderate increases in contract pickup costs as set forth in the current <br /> contract. The contractual agreement with the recycling contractor specifies that the City is to receive a <br /> portion of the monies generated from the re-sale of recycled materials. This is expected to generate <br /> approximately $90,000 per year and will allow for a relatively small rate increase of only 1.7%. <br /> Rate Impacts for 2012 <br /> Based on the rate impacts described above, Staff is recommending a rate increase for ALL utility rate <br /> categories. With these suggested rate changes, a typical homeowner will pay approximately $163.80 <br /> per quarter, an increase of$39.95 or 32.1%. Additional detail is shown in the tables below. <br /> 3 <br />