Laserfiche WebLink
<br /> <br />~ <br />EN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />July 9,2007 <br /> <br />AGENDA ITEM: 2.G. <br /> <br />TO: Honorable Mayor and City Council <br />Michelle Wolfe - City Administrator <br /> <br />FROM: Michelle Olson, Recreation Program Supervisor -t/lo <br /> <br />SUBJECT: Ice Rink Warming House Review <br /> <br />BACKGROUND <br />At the May 8, 2006 Regular City Council Meeting, a warming house comprehensive report was <br />presented. The City Council tabled the item to the June 19, 2006 Work Session for further <br />discussion. After lengthy discussion and analysis, the City Council approved a warming house <br />replacement plan on July 27,2006. The following maintenance took place in 2006: <br /> <br />Cummine:s Park - The rink light controls were moved from the utility room to the <br />kitchen at a minimal cost by the Public Works Dept. <br /> <br />Freewav Park - Existing building was torn down, a concrete slab was constructed for <br />$3,700, moved warming house from Valentine Park to Freeway Park for a cost of$4,000, <br />disconnectedlhooked up electrical from the building at Valentine Park before and after <br />the move to Freeway Park for a cost of $2,150, and the building was repainted for $200. <br />Total Cost: $10,050 <br /> <br />Hazelnut Park - The warming house building had the following maintenance done in <br />2006: siding replaced on the east side for $100.00, interior paneling was done on the <br />ceiling for $228, minor spot repairs to the roof for $146 and the interior ceiling and <br />exterior of the building were repainted for a cost of $50. Total Cost: (not including <br />labor) $524.00 <br /> <br />Perrv Park - The roof was completely replaced at $747.08 (not including labor) and <br />$500 for a dumpster. Total Cost: $1,247.08 <br /> <br />\\Metro-inet.us\ardenhills\PR&PW\Parks\Memos\Council Memos\warming house Review <br />07.DOC <br />