My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-02-26 JDA WS
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Minutes
>
2026
>
02-02-26 JDA WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 2:29:55 PM
Creation date
5/1/2026 2:29:53 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joint Development Authority Work Session <br />Monday, February 2, 2026 <br />Arden Hills City Council Chambers <br />Minutes <br />5:30 pm <br />Roll Call <br />Joint Development Authority: Chair Jon Wicklund, Commissioner Tara Jebens-Singh, <br />Commissioner Kurt Weber, Commissioner Kelly Miller, Commissioner Tena Monson <br />Also present: Jessica Jagoe (Arden Hills); Ella Mitchell (Ramsey County), Rachel Tierney <br />(Kennedy & Graven), John Mazzitello (Ramsey County), Eric Fosmo (Kimley Horn) <br />Roll call taken. <br />Public Input <br />None. <br />New Business <br />a. Discuss Infrastructure Update <br />Eric Fosmo, Kimley Horn, stated at the October 2025 JDA work session, staff presented an <br />infrastructure project update, outlining the overall scope, progress, and key design <br />considerations. During that presentation and work session discussion, JDA members raised <br />several questions and provided feedback that identified areas requiring additional analysis and <br />follow-up by both staff and the project design team. <br />Mr. Fosmo reported since that time, staff and the design team have reviewed the comments <br />received, evaluated potential options, and refined elements of the project in response to the <br />JDA’s discussion. Staff provided an updated presentation on the infrastructure project, <br />beginning with a PowerPoint presentation summarizing project status, and outstanding <br />considerations. As part of this update, staff returned to two specific topics that generated <br />significant discussion in October: lighting and trail design. These items were brought back to the <br />JDA for further discussion and direction to ensure alignment with project goals, the TRC, and <br />the overall design intent. <br />Mr. Fosmo explained in addition to the presentation, a technical memorandum was provided <br />for JDA review. The technical memorandum discusses both the lighting and trail design <br />elements as outlined in the TCAAP Redevelopment Code (TRC) and provides supporting detail <br />related to the proposed infrastructure improvements. He reviewed a typical roadway section <br />with utilities and commented on where district energy could be located. He noted the City’s
The URL can be used to link to this page
Your browser does not support the video tag.