Laserfiche WebLink
<br />?F~(c)q <br /> <br />DRAFT NOTES OF <br />DEVELOPMENT REVIEW COMMITTEE <br />MEETING OF MARCH 30, 1999 <br /> <br />RE: TRIANGLE WAREHOUSE <br /> <br />1. Minor subdivision awaits ruling from Transportation Board and Joel Jamnik <br />regarding time review. <br /> <br />2. Drainage from pond may run into RR right-of-way and cause erosion; what has <br />watershed said about soil retention in this area? <br /> <br />3. Screening of south side trucks/loading with evergreens. <br /> <br />4. Council adopted resolution, on March 22, 1999, supporting eventual right-of- <br />way acquisition. <br /> <br />5. If railroad line spur enters from east, new crossing on Walnut will be required. <br /> <br />6. Issues on building (dumpster enclosure). <br /> <br />7. If rail spur goes in, is there room for proof of parking? Will parking be able to <br />operate with rail caron siding? <br /> <br />8. Setback along south side of curb to property line should read 5' (not shown on <br />plans ). <br /> <br />9. Show how area behind wall along west property line can be planted in order to <br />screen trucks from Minneapolis Gross golf course. <br /> <br />10. Show detail of retaining wall within the pond to determine materials consistent <br />with wet area/pond. <br /> <br />11. Need Rice Creek Watershed approval. <br /> <br />12. Oil skimmers in catch basins as per Rice Creek Watershed requirement. <br /> <br />13. See Chuck for landscape and front berm; cannot be more than 3:1. Why have <br />berm? <br /> <br />14. Specify MnDot wet seed 25A mix adjacent to pond. <br /> <br />15. Sod all areas adjacent to building. <br /> <br />lo')o.YP1 <br />