My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2B, I-694 TH 51 Discussion
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
01-18-11-WS
>
2B, I-694 TH 51 Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2011 11:12:03 AM
Creation date
1/18/2011 11:11:12 AM
Metadata
Fields
Template:
General
Document
I-694 TH 51 Discussion
General - Type
I-694 TH 51 Discussion
Category
I-694 TH 51 Discussion
Date
1/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 The City requests MnDOT clearly state that the existing area on TH 5lavailable for non <br />motorized/pedestrian movements will not be lessened in the future with the proposed <br />improvements. <br />Mn /DOT response The existing bridge structures have less width for non-motorized/pedestrian <br />movements than the proposed bridge structures. <br />13 The City requests that MnDO T commit to including the design standards laid out in the <br />Architectural and Aesthetic Design Guidelines for the 1 -694 Corridor from the Mississippi River <br />Crossing in Fridley to the 1 -694 Interchange in Oakdale, July 2002. <br />Mn /DOT response Mn /DOT commits to using the Architectural and Aesthetic Design Guidelines <br />for the 1 -694 Corridor from the Mississippi River Crossing in Fridley to the 1 -694 Interchange in <br />Oakdale, July 2002. This document has been given to the bridge design consultants and is being <br />used by the Mn /DOT bridge design unit in the development of the bridges for the project. <br />14 The City requests that MnDO T affirm the intentions for 2015 reconstruction of County Road E <br />bridge over TH 51 and consider the possibility of moving this construction up in time to match the <br />balance of the regional construction (for bid economies of scale and logistics). The City may be <br />able to advance the funds necessary for this construction given a firm repayment in 2015. <br />Mn /DOT response Mn /DOT will continue the development of the CR E bridge project in <br />partnership with the County and City. The current Mn /DOT scoping document has been shared <br />with Arden Hills and Ramsey County. This proposed project could move up if a funding source can <br />be found. <br />Mn /DOT appreciates Arden Hills' continued involvement with this project. Please let me know if <br />you have any questions. 1 am available at 651 -234 -7722. <br />Sincerely, <br />ark J. Linde erg <br />North Area Engineer <br />Minnesota Department of Transportation <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.