Laserfiche WebLink
S <br /> RAMSEY COUNTY PROJECT <br /> II. Grade separation of Highway 10 and County Road 96 <br /> The City understands that grade separation of these two roadways is proposed to address f <br /> safety and traffic operational issues. Due to these improvements, some properties may be <br /> negatively impacted and the City wants to assure that all measures to reduce the impacts are -- <br /> undertaken. <br /> ❑ DESIGN CONSTRAINT 41 <br /> Mitigate noise impacts to residential areas located south of County Road 96. <br /> 3 <br /> ❑ CITY PERSPECTIVE <br /> Due to grade separation,the City is concerned that noise levels may increase for these <br /> residential areas. The City would like to review mitigation measures and costs to see if <br /> noise can be reduced through noise walls,landscaping and/or paving and views that cost <br /> of noise mitigation is the responsibility of MnDOT and Ramsey County_ <br /> to DESIGN CONSTRAINT#2 <br /> Review need to provide an exit ramp from north bound Highway 10 onto east bound <br /> County Road 96. <br /> ❑ CITY PERSPECTIVE <br /> City would like to provide better local access onto County Road 96.if it makes financial <br /> sense,due to the proposed elimination of Interstate 694 exit onto Hamline Avenue. <br /> ❑ DESIGN CONSTRAINT#3 <br /> Minimize impacts to Arden Manor by consideri minimizing median, shoulder. <br /> boulevard,sidewalk and trail widths on north and south side of County Road 96. <br /> ❑ CITY PERSPECTIVE -- <br /> City would like to preserve as many homes along County Road 96 as possible and local <br /> decisions on medians, shoulders, boulevards, sidewalk and trail widths and location of <br /> trail(s)on one or both sides of the roadway may be ways to assist in meeting this goal. <br /> The City also understands that appropriate turn lanes,alignments with bridges and other <br /> traffic flow and safety issues need to be adequately addressed in the design and may <br /> dictate certain elements of the road layout. <br /> ❑ DESIGN CONSTRAINT 94 <br /> Utilize existing southern edge of County Road 96 as future edge of all improvements <br /> and for future alignment of Interstate Highway 35 bridge expansion. <br /> i <br /> ❑ CITY PERSPECTIVE <br /> City would like to preserve as many homes along County Road 96 as possible and if the <br /> alignment can meet engineering standards by having County Road 96 located as far <br /> south as possible,that would be preferred. <br /> j <br /> y <br /> e <br /> EI <br /> 1 <br /> 3 <br /> j <br />