My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2A, MnDot I694TH 51 Improvement Project Municipal Consent Discu
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
10-11-10- WS
>
2A, MnDot I694TH 51 Improvement Project Municipal Consent Discu
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 12:07:04 AM
Creation date
1/31/2011 10:48:03 AM
Metadata
Fields
Template:
General
Document
10-11-10 City Council Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* DESIGN CONSTRAINT#5 <br /> Provide pedestrian crossing over or under County Road 96 between Highway 10 and the <br /> access point cast of North Heights Lutheran Church. <br /> * CITY PERSPECTIVE <br /> City would like to provide safe access to pedestrians to cross County Road 96 to access i Deleted:over <br /> trails,etc_ 3 <br /> * DESIGN CONSTRAINT#6 <br /> Any bridge(s)constructed should provide safe pedestrian crossing/access. <br /> * CITY PERSPECTIVE <br /> The City wants to assure there are safe pedestrian connections to its trail system and any <br /> crossing over or under Highway 10 or County Road 96 needs to be wide enough to <br /> accommodate such access, <br /> CITY PROJECT 7' <br /> 111. Preserve full access for residents and businesses between <br /> Highway 10 and County Road 96 through development of an <br /> interchange that includes access to TCAAP from Highway 10 <br /> The City supports providing full access for residents and businesses between these roadways <br /> and access to the TCAAP site from Highway 10. However.the City is of the opinion that <br /> the following four aspects need to be further resolved- <br /> 1. Deter-mine itan at-grade signalized,intersection can be constructed to provide access to Detated:r.. <br /> --------------- <br /> the TCAAP site on a temporary or permanent basis <br /> 2. Number of entrance/exit ramps that need to be constructed for the interchange and when <br /> 3. How to provide safe access for Scherer Brothers <br /> 4. Can or should Highway 10 be realigned to move the interchange further northeast <br /> The City understands that construction of a full interchange/intersection will need to be <br /> shown on the plans but would like the ability to review timing and phasing options for the <br /> project. <br /> 1• DESIGN CONSTRAINT#1 Deleted.option <br /> Formatted-Font:Not Bold,No <br /> ,Review MnEL0 .gd_pl to determine if an at-grade signalized intersection at Highway underline <br /> 10 into the TCAAP site can be constructed. Formatted:Fort:NaBold,No <br /> underline <br /> • CITY PERSPECTIVE formatted:Fom Not BoW,No <br /> underline <br /> Zld'W.' <br /> ,Pity is of the opinion that this is a viable option as a temporary or permanent.solution <br /> ndedineFormatted,Font.,Not <br /> and would like to review timing phasing options�and c s. <br /> Deleted:and <br /> 1 FGjrmatted!Font:Not Sold,No <br /> I Formatted;Font-Not Bold,No <br /> underline <br />
The URL can be used to link to this page
Your browser does not support the video tag.