My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
10-7-08- Special Meeting
>
Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2011 4:03:17 PM
Creation date
2/9/2011 4:03:16 PM
Metadata
Fields
Template:
General
Document
10/7/2008 Council Special Meeting
General - Type
10/7/2008 Council Special Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Including engineering and inspections, the total cost of the additional repairs is $105,482.50, <br />which is $63,782.50 more than the approved contingency. Items 1 and 4 can be completed <br />without additional Council action because they can be covered by the existing contingency. <br />However,items 2 and 3 will cause the project to exceed the approved cost and contingency. If <br />the repairs for items 3 are delayed to 2009, AJS states that the cost would increase by $2,500. <br />TheCity’s buildingofficial, Dave Scherbel, and the project engineer from WJE, Brian Pashina, <br />will be in attendance to discuss the reason, cost, timing, pros, and cons of the additional repairs. <br />Mr. Scherbel is reviewing the project to determine if other options are available that may help <br />lower the cost. <br />Finally,this project is sensitive to the weather, and the contractor has expressed concern <br />regarding the application of a cleaning agent on the masonry once the area has been completed. <br />In order for the product to work correctly, the surface temperature needs to be above 50 degrees. <br />If the repairs described in items 2 and 3 are to move forward in 2008, approval is needed as soon <br />as possible to ensure that work can be completed before the weather changes. <br />FinancialImplications <br />Funding for this project is availablefromtheEquipment Building and Replacement Fund.This <br />fund was established during the 2008 budgeting process and City Hall repairs were budgeted in <br />the 2008-2012 CapitalImprovement plan from this fund.The City will be utilizing funds <br />received from the mediation settlement. <br />Requested Action <br />If the repairs described items 2 and 3 are approved, the motion would be as follows: <br />Motion to Amend the Contract with A.J. Spanjers Company, Inc and Wiss, Janey, Elstner for the <br />Masonry Façade Repair Project at City Hall for a Revised Total Amount Not to Exceed <br />$308,372.50. <br />\\Ahdocs1\ah\AHdata\Building\City Hall\Masonry Facade repairs\100608- CC Report - Masonry Facade repair.doc <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.