My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7I PC 08-006 Northwestern College
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
03-31-08-R
>
7I PC 08-006 Northwestern College
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:39:47 AM
Creation date
2/10/2011 10:38:40 AM
Metadata
Fields
Template:
General
Document
3-31-08 Council Regular
General - Type
3-31-08 Council Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9_ The applicam shall obtain a�l necessary permits, ine�uding, but not Iimited to, <br />NPDES, Rice CreeI� Wa#ershed District, Ra�nsey Cou�ty and City Erosion Control <br />permits, prior to the execution of the Site Plan Agreement. <br />14. The app3icant sha11 submit revised pIans for the twenty foot wide roadway, subject ta <br />City Planner and Building Official appro�al, prior to the execution of the Site Plan <br />Agreement. <br />11. The property owner shall be responsible for regular maintenance of the ►�nderground <br />�nfliration basin. <br />12. Any direct, untreated pipe discharges into Lake .Tohanna and Little Lake 3ohar�na <br />located witnin this phase's construction �imits will be eliminated. The remaining <br />direct, untreated discharges will be eliminated in subsec�uent phases. <br />13. Areas showing 2:l slopes shal� be sodded with Fescue, no-mow sod, and subject to <br />additional landscaping treatrnents should the City Engineer determine that erosion is <br />occurring in those locations. <br />14. All retaining walls s�all be labeled with proposed elevations. <br />15. The Iocation of water main s�alI be adjusted to have ten-foot (10') separation from <br />any parallel sanitary or storm sewer pipe, prior to the �xecution of the Site P3an <br />Agreement. <br />16. The ap�licant shall identify the water source for the proposed i�gation system, <br />subject to City Engineer Approval, prior to the execution of the Site Flan Agreement. <br />17. The project sl�all be subject to Fire Marshal approvaI. The applicant sha�l eomply <br />with any cor�ditions set by the Fire Marshal. <br />1 S. Upon comple#ian of the project, the City may req�iz-e additional vegetation, berming, <br />fencing, ar�d/or other types of screening to further reduce or eltminate light from the <br />proposed parking lot, roadway, and related vehicular traffic if the City fnds that the <br />lighting is �ot in conformanee with the approved Master PUD. <br />19. The ring road shaJl be maintained as a or�e-way road. <br />20. Traffic calming measures shall be implemented on the ring-road, including but not <br />limited to striping of the pavement that designates four feet af the eastern side af the <br />roadway as a dedicated bike lane, narrowing the driving width of the road to 16 feet, <br />subject to City Staff approval. <br />21. At least SO percent of the landscaping along tY�e road in Arden Hills shaFl be installed <br />prior to construction beginning on the parking lot or roadway. <br />Options <br />I. Approve the proposal as submitted. <br />2_ Approve the proposal with conditions. <br />3. Deny the app3icatian with reasons for denial. ]f �k�e City denies �he petitioners xequest, "...it <br />must state ir� writing the reasons for �e denial at t�e time it de�ies the request." <br />4. Table for additional information. <br />crry of.�Ya�n xrlrs <br />City Council Meetirrg for March 31, 2008 <br />IVMetso-i�re�.uslardenlvillslAlaxninglPlanningCases42008108-Q06NWCSitePlanReriesti (PCApprored)1U331�8-CCReport-NWCSiteAlan <br />Rerie,+.doc <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.