Laserfiche WebLink
official mailing addresses. In order to be effective, the name would need to be officially <br /> changed to Lake Johanna Boulevard. <br /> Streetscane Planning and Design <br /> The current Capital Improvement Plan (CIP)programs $270,000 in 2011 to "Prepare a specific plan <br /> and improvement for traffic, landscaping, lighting, and pedestrian movements along both sides of <br /> County Road E from the eastern ramp terminals of Highway 51 to and including the Lexington <br /> Avenue intersection." According to the Guiding Plan,the preliminary list of improvements planned <br /> for County Road E include: <br /> • A traffic signal system at the future intersection located between Pine Tree Drive and <br /> Lexington Avenue; <br /> • Replace signals, arms, and poles for the existing signal systems, if necessary, at the <br /> eastern ramp terminals of Highway 51, Pine Tree Drive, and Lexington Avenue; <br /> • Boulevard trees spaced at an average of 40 feet; <br /> • A planted median that may include trees, shrubs,tall grasses and annual flowers; <br /> • Decorative lighting with contemporary styling at the automobile scale (on the existing <br /> bases, located 200 feet apart); <br /> • Optional decorative lighting at the pedestrian scale located approximately 50 to 70 feet <br /> apart; <br /> • Benches and trash receptacles; <br /> • A pair of new continuous concrete sidewalks (b feet wide) with connections to adjacent <br /> businesses; <br /> • Bollards; _ <br /> • Annual flowers (in beds or raised planters); <br /> • Seasonal banners on the light poles; <br /> • Striped or colored pedestrian crossings; <br /> • Bus waiting shelters; <br /> • Relocating the electrical boxes to a less visible location or screening where feasible; <br /> and/or <br /> • Underground utility repair/replacement(water, sewer, stormwater). <br /> The CIP programs $2.2 million for County Road E improvements in 2012. The schedule for <br /> construction of improvements may be phased or modified depending on the timing of the bridge <br /> reconstruction. <br /> Si realized Intersection between Pine Tree Drive and Lcxin ton Avenue <br /> A traffic impact study was prepared for the Guiding Plan. According to that traffic study, the <br /> roadways and intersections within the B2 District currently operate acceptably at Level of Service <br /> City of Arden Hills <br /> City Council and Planning Commission Joint Work Session—February 22, 2011 <br /> llMetro-inet.uslardenhillslAdminlCouncilUgendas&Packet InformatioW201112-22-11 Worksession Packet InformationW2-22-11-PC and CCJoint <br /> Work Session-Guiding Planfor the B2 District Update.doc page 3 of 5 <br />