My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2A, Guiding Plan for the B2 District - Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
02-22-11-WS
>
2A, Guiding Plan for the B2 District - Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 12:05:44 AM
Creation date
2/17/2011 4:16:17 PM
Metadata
Fields
Template:
General
Document
2A, Guiding Plan for the B2 District
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(LOS) D or better and will continue to operate at LOS D or better through 2030 when <br /> redevelopment is expected to be completed. <br /> The traffic study found that the driveways on County Road E for the Holiday Inn site and the Arden <br /> Plaza site will experience significant delay and queuing in the afternoon peak hour even though the <br /> overall intersections will operate within traffic engineering standards. To reduce queuing and <br /> increase the safety and vitality of future redevelopments, the Guiding Plan calls for a new <br /> intersection on County Road E between Pine Tree Drive and Lexington Avenue. Driveways would <br /> be realigned midway between Pine Tree Drive and Lexington Avenue to provide a controlled <br /> intersection that will operate at LOS B in the 2030 afternoon peak. <br /> Recently a development proposal of the Holiday Inn site and tenant changes at the TCF building <br /> made it seem unlikely that the new intersection could be developed within the near future. The <br /> development proposal for the Holiday Inn site, however, appears that it may not proceed. It is <br /> important to recognize that the B2 Guiding Plan is a 20-year plan, and based on discussions with the <br /> County,the current traffic conditions on County Road E do not warrant an additional signalized <br /> intersection at this time. In fact, the County would not allow a new signal to be installed until the <br /> traffic volumes at the intersection meet the criteria for installing a traffic signal per the Minnesota <br /> Manual on Uniform Traffic Control Devices. Traffic volumes are not expected to warrant anew _ <br /> signal until redevelopment occurs with significant increases in intensity of use'. During the 20-year <br /> planning period, the City will likely have opportunities to acquire the right-of-way necessary to <br /> implement the new signalized intersection. <br /> Current options for a new signalized intersection are as follows: <br /> 1. Continue to implement the existing plan for a new signalized intersection between Pine Tree <br /> Drive and Lexington Avenue. Take advantage of opportunities to acquire right-of-way as <br /> they occur. <br /> 2. Evaluate other options for realigning driveways and traffic movements along County Road <br /> E. <br /> Recommendation <br /> Staff recommends proceeding with planning and design work for the streetscape improvements in <br /> 2011. The reasons for this recommendation are as follows: <br /> • The B2 Guiding Plan was approved in 2008. It is important to continue to demonstrate the <br /> City's commitment to the improvement of the B2 District. <br /> 1 A traffic study was completed in 2007. The traffic study was submitted by the developer of Arden Plaza and reviewed <br /> by both Ramsey County traffic engineers and SRF,the City's traffic consultant. The County concurred with SRF's <br /> conclusions,which stated that a new traffic signal would not be warranted until at least Phase IV of the Arden Plaza <br /> development,and possibly not until significant redevelopment of the Holiday Inn site. <br /> City of Arden Hills <br /> City Council and Planning Commission Joint Work Session—February 22, 2011 <br /> lMetro-inet.uslardenhillsWdminlCouncilUgendas&Packet lnformation1201112-22-11 WorksessionlPacket information l02-22-11-PCandCCJoint <br /> Work Session-Guiding Planfor the B2 District Update.doc page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.