� <br />EN HILLS <br />MEM4RANDUM <br />DATE: June 27, 2011 <br />TO: Honorable Mayor and City Council Members <br />Patrick Klaers, City Administrator <br />FROM: Krisiine Giga, Civil Engineer <br />SUBJECT: Rice Creek Watershed District Cost Share Agreement for the 20ll <br />Pavement Management Program <br />Back�round/Dis cussion <br />In March, staff applied for funding from the Rice Cree� Watershed District <br />(RCWD) thra�gh its 2011 Urban Stozmwater Remediatian Cost-Share Program. This <br />funding is avazlable to assist m�aicipalities located within the RCWD to incorparate <br />water quality improvement Best Management Practices (BMPs} into redevelopment, <br />roadway and storm sewer irnprovement projects in 2011. Only storm water <br />improvements that are not part of a RCWD perrnit requirement are eligible far this <br />f�nding. The RCWD Board reviewed the City's application and appraved this project for <br />funding at iheir May 25 Board meeting. A copy of the cost-share agreement is included in <br />this packet. The Ciiy At�orney reviewed the agreement and did not have anq commenis. <br />Improvements are proposed in two areas that woi�td be eligible for cost-share dollars. The <br />first is the canstruction of an EcoSiorm structure, or grit chamber, on Nizrsery Hill Lane. <br />This will allow for suspended solids to settle out in the structure prior ta storm water <br />discharging to Karth Lake. In the existing storm sewer system, pre-treated wa#cr that has <br />filtered tl�rough wetlands mi�es with nFnoff directly from the street prior io dischaxging <br />to K�rth Lake. The proposed system will separate the pre-treated water from the street <br />runoff. New pipe wi�l be constructed ihat will allow the pre-treated water to be diverted <br />directly to the lalce, whil� the street runoff w-ill be direcied to the EcaSiarm structure for <br />treatment, prior to discharging into Karth Lalce. <br />The second i�nprovement is th.e construction of an outlet conirol siructure in the wetland <br />on ihe north side of Nursery Hiil Court. The existing outlat is a 12" pipe that easi�y clogs <br />witY� leaves and debris, restricting ihe flow leaving the vvetland. With the outlet coni�ol <br />structure, the flow will still leave the wetland via a pipe. The outiet controI structure vvili <br />be constructed in a method that, during srnall storm events, wiIl detain water in the <br />wetland a little longer than it does in existing conditions, �vhich will allow for improved <br />City Council Meeting <br />IlMetro-inet.uslardenhi�lslPR&PW1EngineeringlCouncil Actions12Q1116-27-11Mema RCWDCostShare 2011.doc <br />Page I of 2 <br />