Laserfiche WebLink
water quality treatment through the wetland. However, in higher rain events when the <br />wetland f lls, there is also an overflor�v tihraugh the top of the sinicture, which provides <br />additional protection to the neighbor�ng praperties. <br />Financial Imulications <br />The RCWD cost-share is a 50% ma�iz�nu�n. The estimated costs submitted with the <br />applicatian were $60,332, for a maximum contribution of $30,166. Since the application <br />was submitted, ihe City work�d throt�gh the RCWD pernzit process. It was determined <br />tha# additionai improvements were needed to meet the minimurn. requirements. The <br />revised project costs that are considered above and beyond the permit requirements and <br />are eligibie for the cost-share are approxirnately $42,OQ0. RCWD's contribution would <br />then be capped at $21,000. The City's portion of these project costs is funded from the <br />Surface Water Management Fund. <br />Council Action Requested <br />Accept cost-share fiulds from tk�e Rice Creek Watershed District and approve the cosi- <br />share agreement for stonmwater improvements in the 201 � Pavement Management <br />Program. <br />Ciiy Council Meeting <br />11Metro-inet.uslardenhillsll'R&PWl�ngineeringlCouncil_Actions1201 i16-27-I 1Memo RCWDCostShare 2411.doc <br />Page 2 of 2 <br />