Laserfiche WebLink
Discussion <br />The project, as proposed, meets all of the requirements of the City’s Zoning Code, and <br />substantially conforms to the City’s design standards for the B-2 District. A complete review of <br />the application can be found in the June 8, 2011, report to the Planning Commission (Attachment <br />D). <br />Traffic <br />The subdivision of the property into two lots would create a nonconforming parcel. Lot 2 would <br />not be conforming because it would have no direct access to County Road E or Lexington <br />Avenue. The County has indicated that they are not in favor of allowing an additional access in <br />this area. That being said, a traffic study was completed that looked at ingress and egress to both <br />parcels, and found that, depending on what is developed on Lot 2, traffic would not be <br />significantly increased, and may even decrease compared to the traffic generated on the site as a <br />hotel. <br />RLK Engineering prepared a traffic analysis of the site, specifically looking at past, present, and <br />anticipated traffic generation to and from the property (Attachment C). Because the user of Lot <br />2 is unknown, RLK prepared their analysis assuming five different development scenarios for <br />Lot 2: a specialty retail use, a fast food restaurant, a bank, an office, and a pharmacy. The traffic <br />analysis found that given the reduction in vehicle trips from the senior housing, additional <br />development could occur on Lot 2 without significantly increasing overall trips to and from both <br />properties. <br />While the vehicle trips in and out of the site are likely not going to exceed capacity, ingress and <br />egress to Lot 2 is critical in maintaining proper traffic flow and safety. Staff has suggested that <br />directing one-way traffic through the front drop-off area from west to east would improve the <br />exiting movements out of both Lot 1 and Lot 2. In addition, Staff has suggested a number of <br />traffic management improvements that could be implemented with the development of Lot 2, <br />depending on the anticipated traffic generation, that would provide safe and efficient traffic flow <br />into and out of that site. <br />Traffic management improvements could include adding a pork chop to ensure all traffic <br />entering the east driveway turns right into Lot 2; widening the drive aisle accessing Lot 2; and <br />adding a median on the drive aisle between Lot 1 and Lot 2 to separate traffic entering and <br />leaving Lot 2. Implementation of these traffic management solutions would be done with the <br />development of Lot 2, and would have the result of allowing Lot 2 to have near exclusive use of <br />the eastern driveway, effectively separating the traffic generated by the two parcels. <br />Park Dedication <br />Park use dedications are required as part of the approval of a subdivision of this property. <br />According to the City’s subdivision ordinance the property is subject to a park dedication <br />City of Arden Hills <br />City Council Meeting for June 27, 2011 <br />\\Metro-inet.us\ardenhills\Planning\Planning Cases\2011\11-011 - Select Senior Living PUD (PC Approved)\06-27-11 - Select PUD and Plat - <br />Memo.doc <br />Page 3 of 8 <br /> <br />