My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4F, Motion to Adopt Res 2011-037 Accepting Work Completed and Authorizing Final Payment for Lexington Ave Sidewalk and Trail Project
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
07-25-11-R
>
4F, Motion to Adopt Res 2011-037 Accepting Work Completed and Authorizing Final Payment for Lexington Ave Sidewalk and Trail Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:36:47 AM
Creation date
8/11/2011 8:59:50 AM
Metadata
Fields
Template:
General
Document
July 25, 2011 Reg. City Council Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction p%ases. Legal fees include the City Attort�ey's time in �eviewing and <br />preparing the assessment documentation %r In�and Properties. <br />The following table shows a breakdown of costs for each segment of the trail. Costs <br />include construction, engineer�ng, and legai fees. <br />Original B�dgeted Original Contract Final Con#ract Amount <br />Arr�ount Amount <br />Existing Bitu�inous <br />Traii (Cummings Park $ Sfl,000 $ 57,12I .62 $ 52,49Q.62 <br />Dr. ta Co. Rd. �) <br />New Concrete <br />Sidewalk (Grey Fox $ 63,000 $ 54,004.00 $ 54, I22.55 <br />Rd. to CP Rail} <br />Total $133,000 $l i 1,121.62 $306,613.17 <br />The sod quantity along the existing bituminous trail was higk�er than the quantity along <br />tne concrete sidewaIk. The c�ange fror� sod to hydroseed, therefore, resulted in a lower <br />final contract amount for this segment. There was a sIight increase in subgrade <br />exca�ation costs for the concrete sidewalk to ensure a praper base under the new <br />sidewalk. <br />This project will be paid for using PIR funds. 50% of the cost far the construction of the <br />concrete sic�ewalk will be assessed to Inland Properties. This amount, $27,061.2$, will be <br />divided evenly between Cub and Shannan Square so that each garty is assessed <br />$13,530.64. This assess�ent will be brought to the City CounciI for certifcation at an <br />upcorning council rneeting. <br />Coa�cil Action Reqe�ested <br />Approve Resol�ztion 20t l-037 accepting the work cornpleted as Lexington Avenue <br />Sidewalk and Trai1 Project and authorizing fnal payment to North Valley, Inc., of <br />Nowthen, Minnesota, i� the amount of $13,598.3Q. <br />City Council Meeting <br />11Metro-anet.uslardenhillslPl2&PW1EngineeringlCo�€�cil Actions1201117-25-I1Memo_LexTrailPayment2andFinal.doc <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.