Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
2. The neighborhood requested a noise wall for the southwest quadrant of the <br /> intersection. Mr. Dave Cmiel has suggested that the noise analysis could be <br /> looked at in a different manner which will make it entirely fundable by the <br /> project. Ramsey County has reviewed Mr. Cmiel's analysis and responded with <br /> the attached letter indicating the noise wall is still not entirely fundable. <br /> 3. Timing of the projects is important as Mn/DOT has suggested the US 10/Hwy 96 <br /> project could be constructed in 2012 along with the 1-694 improvements. If this <br /> were to occur the Hamline/Snelling crossing of I-694 would be closed at the same <br /> time Hwy 96 is closed due to the lowering of the roadway 22 feet. This would <br /> force all trips from north to south Arden Hills including Public Works and Sheriff <br /> to use Lexington Avenue which will also have bridge widening work happening <br /> in 2012. <br /> Council Action Requested <br /> Staff is looking for direction as to how the City Council would like to proceed. The three <br /> options for the Council are: <br /> • Adopt a Resolution approving the Final Layout and providing Municipal Consent. <br /> • Adopt a Resolution denying approval of the Final Layout and denying Municipal <br /> Consent. <br /> • Adopt a Resolution disapproving the Final Layout with conditions required for <br /> approval. Once the conditions are met by Mn/DOT and/or Ramsey County the <br /> Final Layout and Municipal Consent are deemed to be approved (If the City <br /> Council chooses this option, staff is looking for conditions that need to be <br /> included in the Resolution.). <br /> City Council Meeting <br /> C_lUserslterry.maurer\Desktopl9-19-1 1 Hwy l 0-96.doc <br /> Page 2 of 2 <br />