My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2C, B2 District Implementation Plan
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
10-17-11-WS
>
2C, B2 District Implementation Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 12:14:14 AM
Creation date
10/14/2011 10:01:13 AM
Metadata
Fields
Template:
General
Document
City Council Work Session Oct. 17, 2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In St. Louis Park, the corridor project included pedestrian and street lighting, median <br /> landscaping, custom bus shelters,paving, retaining walls and boulevard plantings. The project <br /> involved close coordination with Hennepin County and was subject to the County's roadway and <br /> aesthetic design policies. <br /> Central Avenue—Osseo <br /> To accommodate projected <br /> residential and commercial growth <br /> and to maintain a vibrant downtown <br /> business district, Central Avenue's <br /> infrastructure required a major <br /> upgrade of utilities, roadway <br /> pavement, and streetscaping. High <br /> quality strectscape improvements - <br /> reflect the City's sentiments and <br /> dedication toward downtown Osseo. <br /> Gateway monuments greet visitors ; _ <br /> at both ends. Decorative paver <br /> sidewalks direct pedestrians along a <br /> corridor of ornamental trees, planter <br /> boxes, benches, bollards and waste receptacles. The street is lined with decorative LED lighting <br /> with poles that support banners, flagpoles, and hanging baskets. The boulevard was constructed <br /> using pervious pavers, reducing storm water runoff into the street and storm sewer. <br /> Key Elements of Corridor and Streetscape Projects <br /> The corridor and streetscape projects in Shakopee, Hopkins, St. Louis Park, and Osseo have key <br /> elements that the City of Arden Hills may need or want to incorporate into the B-2 <br /> Implementation Plan. These include- <br /> • Extensive communication with and input from the business community on access <br /> changes and construction schedule; <br /> • Coordination with the county for curb-to-curb spacing and design; <br /> • Optimization of existing right-of-way; <br /> • Consideration of vehicle, bicycle, and pedestrian movements; and <br /> • Implementation recommendations that adhere to the community's needs and budget; <br /> B2 ilmlementation Plan <br /> Staff recommends that the Scope of Work for the B-2 Implementation Plan be divided into two <br /> phases. The first phase will be focused on gathering and analyzing information. At the end of <br /> City of Arden Hills <br /> City Council Work Session October 17, 2011 <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.