Laserfiche WebLink
Phase 1, the City will have analyzed options, obtained input from business owners, and defined <br /> specific objectives, a preliminary construction budget, and a timeline for B-2 District <br /> improvements. - <br /> Phase I <br /> 1. Consider budget needs and funding sources. <br /> a. Determine a preferred level of intensity of streetscape improvements. <br /> b. Establish an assessment method for the B-2 District. <br /> c. Suggest options for public funding such as MSA funds. <br /> 2. Work with Ramsey County to determine project scope and goals. <br /> a. Reaffirm the County's acceptance of the B-2 Guiding Plan. <br /> b. Determine space needs within the right-of-way. <br /> I Determine a public participation process. _ <br /> a. Promote business participation in discussions of streetscape and amenities. <br /> b. Work individually with businesses to determine access needs and <br /> vehicle/pedestrian movements onto and within their sites. <br /> 4. Evaluate utilities along County Road E. <br /> a. Determine whether utility upgrades are necessary. <br /> b. Work with Xcel Energy to consider options for electrical boxes. <br /> c. Provide cost estimates for any necessary utility upgrades. <br /> 5. Evaluate traffic and transportation options. <br /> a. Update the 2008 traffic study and include pedestrian movements. <br /> b_ Suggest options for traffic improvements without a new signalized intersection. <br /> C. Investigate options for an alternative access for the Arden Plaza development. <br /> 6. Summarize Phase I findings. <br /> a. Provide a preliminary project budget_ <br /> b. Provide project and decision matrix timelines to align planning, design, and <br /> construction with the reconstruction of the Highway 51 bridge. <br /> In Phase 11, improvements identified in Phase I will be designed. Cost estimates, specifications, <br /> and a construction timeline and phasing schedule, if necessary, will be prepared. At the end of <br /> Phase 11, the City will be ready to proceed to bidding and the construction of improvements- <br /> Budget Implications <br /> City of Arden Hills <br /> City Council Work Session October- 17, 2011 <br /> Page 4 of 5 <br />