My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5E, Drainage Report for Townhouse Villages North and Townhouse Villages at Arden Hills
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
11-14-11-R
>
5E, Drainage Report for Townhouse Villages North and Townhouse Villages at Arden Hills
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:41:19 AM
Creation date
11/10/2011 3:40:52 PM
Metadata
Fields
Template:
General
Document
November 14, 2011 Reg City Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The 'existing�, storm drainage`;system in this' townhome development, should be inspected on a <br />re'gular bas.is to ensure :that there is no' blockage of the grates or in the storm . sewer pipe that <br />would cause water fo backup during storm events. ' <br />, <br />There is_' no emergency� overflow° adjacent to the two ;low� points atudied: Storin events greater <br />than the 100-year design storm'will continue to pose a flooding threat `to adjacent homes;:.even if <br />the.proposed recommendation is.constructed. ' � <br />
The URL can be used to link to this page
Your browser does not support the video tag.