My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5E, Drainage Report for Townhouse Villages North and Townhouse Villages at Arden Hills
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
11-14-11-R
>
5E, Drainage Report for Townhouse Villages North and Townhouse Villages at Arden Hills
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:41:19 AM
Creation date
11/10/2011 3:40:52 PM
Metadata
Fields
Template:
General
Document
November 14, 2011 Reg City Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
When the model was run with a 100-year, 24-hour storm event, assuming no restrictions on the <br />inlets or pipes, the high water levels (HWL) for each low point was: <br />Northern Low Point (on Arden View Drive) = 973.35 <br />Southern Low Point (rectangular grate east of Arden View Ct) = 965.15 <br />There is no emergency overflow to provide relief if the catch basin grates or storm sewers are <br />plugged, or if water in the pipe surcharges and comes back out of the catch basins. When either <br />one of these conditions occur there is potential that the low points will flood. <br />Water will not escape overland from the north low point until it reaches an elevation of <br />approximately 980. At this point, from reviewing the survey, if water reached an elevation of <br />976.7, it would' enter the window sills of the adjacent townhomes. <br />Water will not escape overland from the south low point until it reaches an elevation of <br />appro�cimately 968.5. At this point, the survey shows that if water reached an elevation of 966.6, <br />it would enter the garages/doors of the adjacent townhomes adjacent to this low point. <br />Outions <br />An on-site field visit and a review of eacisting topography maps and construction drawings were <br />used to develop several drainage options. The storm sewer map for this project area shows that <br />appro�mately 75% of the northern portion of the site flows into the southwest corner pond <br />through a single run of storm sewer pipe. <br />The improvement options considered were based upon the location of where the flooding <br />occurred and what appeared to be potential solutions based upon a visual review of the existing <br />drainage system. <br />The following options were modeled and their associated costs calculated: <br />Option 1 (Figure 2) <br />This option involves building a berm azound the southwest corner of Pond 2 and reconstructing <br />the.pond outlet. The existing overflow for Pond 2 is in the southwest corner where an existing <br />pathway is located: Building a berm in this area and replacing the existing outlet with a new <br />structure would allow additional storage (pond bounce) to occur, while at the same time limit <br />the pond discharge to the downstream storm sewer system. <br />Modeling Option 1 showed that this action would have an insigni�cant impact on either the <br />nortt� or south low points. The north low point HWL was 973.26 (-0.09') and the south low <br />point HWL was 965.08 (-0.07') with this altemative. The estimated cost for Option 1 is shown <br />in Table 1. <br />Option 2 (Figure 3) <br />This option would provide an emergency overflow pipe for the low point area located to the <br />southeast of the Arden View Court cul-de-sac. A pipe or a swale could be constructed that <br />would extend from the driveways between units 4364 Arden View Court and 4324 Arden View <br />Court. For the purposes of this analysis a pipe was considered, since this would likely be less <br />
The URL can be used to link to this page
Your browser does not support the video tag.