Laserfiche WebLink
�� Kimisy-Horn Mr. Terry Maurer, Decem6e�• 7, 2011, Page 3 <br />— and Associates, Inc. <br />impact areas, demarking the wetland. A report documenting the boundary, as <br />required by the agencies, will be prepared. <br />Review and approval ofthe delineation will be required by the RCWD, as the <br />local governmental unit, which will also include a review by representatives from <br />Board of Water and Soil Resources (BWSR), the CoE, the City of Arden Hills, <br />and MnDNR. This task assumes one Technica( Evaluation Panel (TEP) meeting <br />on-site, coordinated and led by Kimley-Horn to review the wetland boundaries <br />and provide a general project overview. <br />We will prepare preliminary bridge plans of the new box culvert at the Lake <br />Josephine Discharge Channel crossing at Old Snel(ing Avenue. The preliminary <br />bridge plans will show key geornetrics of the structure including the layout of the <br />culvert in plan, with a general elevation and section of the structure. The <br />preliminary plan will also show the size and invert elevations of the box culvert. <br />We assu�ne the City will provide the desired geometrics of the roadway and trail <br />over the culvert. <br />W.e will coordinate the proposed iinprovements with the RCWD. We have <br />assumed the proposed improvements will requiee a variance from the RCWD <br />floodplain regulations. We will conduct up to two (2) meetings with RCWD staff <br />to coordinate the proposed improvements during the preliminary engineering <br />phase. <br />We will prepare a Conditional Letter of Map Revision (CLOMR) following the <br />appropriate FEMA procedures to document the alterations to the floodplain and <br />floodway boundaries within the project area. Based upon the survey data, we will <br />generate the existing and proposed conditions modet for the channel and include <br />the �nodeling outputs in the CLOMR document. We will prepare floodplain <br />workmaps using the existing digital floodplain boundaries available through the <br />DNR GIS system to document the alterations the proposed improvements will <br />have on the floodplain. All workmaps will be included as appendices to the <br />CLOMR document. We wip prepare the necessary FEMA forms to be reviewed <br />and authorized by the City Engineer. The forms will be included in the CLOMR <br />document. We will prepare the CLOMR document (Technical Data Noteboak) <br />documenting the proposed improvements. The report will inciude the <br />understanding of existing hydrology and hydraulics of study area, description of <br />the proposed improvements, assumptions made in the modeling of those <br />improvements, and summary of the impact the proposed improvements have on <br />the floodplain and floodway. MnDOT Risk Assessment for Encroachment <br />Design and Hydraulic Analysis worksheets will be prepared for the propased <br />stream crossing. <br />