My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5N, Approve a Contract with Kimley Horn, Inc., for Old Highway 10 Bridge Design
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
12-12-11-R
>
5N, Approve a Contract with Kimley Horn, Inc., for Old Highway 10 Bridge Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:13:27 AM
Creation date
12/9/2011 7:39:36 AM
Metadata
Fields
Template:
General
Document
December 12, 2011 Reg City Council Meeti
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
View images
View plain text
�- /� Kimley-Horn Mr. Terry Maurer, December 7, 201 /, Page 4 <br />�� � and Associates, Inc, <br />We will submit the CLOMR documentation to FEMA for review including the <br />$4,400 application fee. We have assumed we will re-submit responses to one <br />round of comments from FEMA before approval. <br />Task 2: Fina[ Design and Permit Coordination <br />Final bridge plans will be prepared based upon the preliminary work and <br />comments from reviewing agencies. The final bridge plans will be prepared in <br />accordance with MnDOT State Aid Standards, including the LRFD Bridge <br />Design Manual. Roadway improvements to Old Snelling will be limited to 50- <br />feet on each side of the bridge, showing the desired roadway and trail cross- <br />sections provided by the City. We will prepare an erosion and sediment control <br />plan to be incorporated into the final bridge plans. The final bridge plans will be <br />submitted to the MnD�T State Aid Bridge Office for review. We will incorporate <br />one set of comments from State Aid review of the plans. <br />We will continue to coordinate iinal design details with the Rice Creek Watershed <br />District. We will submit a set of plans to the RCWD for their review and <br />comment. We will also conduct one (l ) meeting with watershed c3istrict staff <br />during the final design phase to coordinate the proposed improvements. The <br />tneeting will be hetd to gather any additional comments staff may have on the <br />proposed improvements before a permit application is prepared. <br />A Kimley-Horn subconsultant will perform a hazardous materials survey to <br />identify the presence of hazardous materials on the existing bridge. This will <br />provide the required information to include hazardous materials removal <br />quantities on the final bridge plans, if necessaty. <br />We will determine the proposed wetland impacts during the preparation of the <br />final bridge plans. Kiinley-Horn will review the proposed footprint of the bridge <br />reconstruction (grading plan) as it relates to the wetland boundaries and estimate <br />the total potential wetland impact, by wetland type. We will meet with City staff <br />to discuss wetland replacement options and wetland avoidance options for <br />minitnizing impacts. <br />We will conduct one pre-apptication meeting with the Rice Creek Watershed <br />District, representatives fi•om BWSR, the Corps of Engineers, MnDNR, and the <br />City of Arden Hitls to discuss the project impacts, mitigation requirements and <br />permit review process. We have assumed the preparation of the following <br />materials wi11 be necessary; a wetland boundary figure, an impact figure, and a <br />figure showing potential locations for on-site wetland replacement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).