My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2C, Stormwater OutletPond Inventory
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
12-19-11-S
>
2C, Stormwater OutletPond Inventory
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 12:18:18 AM
Creation date
12/16/2011 7:35:19 AM
Metadata
Fields
Template:
General
Document
December 19 2011 Special City Council Me
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page Two <br /> December 2, 2011 <br /> Mr. Maurer <br /> o A digital picture will be obtained for each outfall unless it is determined <br /> that the structure is submerged. <br /> o An inspection form for each outfall will be completed. Information to be <br /> gathered on the inspection form includes size, material type, physical <br /> condition, any damage will be noted, and any illicit discharge indications <br /> will be noted as well. <br /> • In addition to gathering coordinate locations for all outfalls, the field survey will <br /> also gather the location and number of inlets and outlets associated with the <br /> conveyance system to and from each storm pond. This information is needed for <br /> the Stormwater Pond Inventory. <br /> • Due to the time of year, weather may become a factor. If it appears that snow <br /> coverage or temperature has become an issue the City will be notified and it may <br /> be necessary to gather the remaining information in the spring. <br /> • The field data will then be utilized to update the City's GIS map. The outfalls will <br /> be shown on a separate layer at the correct coordinate location. The pertinent <br /> inspection data will then be added to the layer in order for the City to have the <br /> data stored in an easily accessible manner. Updating the GIS map will allow the <br /> City to have the outfalls mapped in the correct, field identified location providing <br /> for ease of future inspection. <br /> We are prepared to start immediately once approval is given. The work would be <br /> completed on an hourly not to exceed basis of$24,000.00. The staff that will be utilized <br /> to complete the work will be under the Staff Engineer($65/per hour)and Technician <br /> ($50/hour) categories. <br /> If you have any questions relative to this proposal, please me at 763-780-0450 ext 2. <br /> Sincerely, <br /> Elfering &Associates Accepted: <br /> Kristie Elfering, P.E. City of Arden Hills Date <br /> 10062 Flanders Court NE, Blaine, MN 55449—Ph:(763)780-0450—Fax:(763)780-0452 <br />
The URL can be used to link to this page
Your browser does not support the video tag.