My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-013
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
2010-2019
>
2011
>
2011-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 12:19:10 AM
Creation date
12/16/2011 12:23:12 PM
Metadata
Fields
Template:
General
Document
Ordinance 2011-013
General - Type
Ordinance 2011-013
Category
Ordinance 2011-013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance <br /> Subd. 2 Application Fee.The Permittee shall submit an application fee as specified on the <br /> City's Fee Schedule as adopted and revised annually by the City Council by ordinance. The <br /> fee is non-refundable and shall cover any review costs accrued within one(1)year of the date <br /> of payment. <br /> Subd. 3 Criteria. The Erosion and Sediment Control Plan shall minimize soil erosion or <br /> sediment from damaging adjacent land. A Permittee engaged in a Land Disturbance Activity <br /> shall submit an Erosion and Sediment Control Plan that will minimize soil erosion or <br /> sediment from damaging adjacent land, bodies of water, watercourses or wetlands to the <br /> PWD for approval. <br /> The Erosion and Sediment Control Plan shall address the following criteria: <br /> A. Conform to the natural limitations presented by topography and soil so as to create <br /> the least potential for soil erosion. <br /> B. Stabilize all exposed soils and soil stockpiles; <br /> C. Establish permanent vegetation; <br /> D. Prevent sediment damage to adjacent properties and other designated areas; <br /> E. Schedule of erosion and sediment control practices; <br /> F. Use of temporary sedimentation basins; <br /> G. Stabilization of steep slopes and bluffs; <br /> H. Control the storm water leaving a site; <br /> I. Stabilize all waterways and outlets; <br /> J. Protect storm sewers and outfalls from the entrance of sediment, debris and trash; <br /> K. Control waste, such as discarded building materials, concrete truck washout, <br /> chemicals, litter and sanitary waste that may adversely impact water quality; <br /> L. When working in or crossing water bodies, take precautions to contain sediment; <br /> M. Re-stabilize utility construction areas as soon as possible; <br /> N. Protect paved roads from sediment and mud brought in from access routes; <br /> O. Dispose of temporary erosion and sediment control measures; <br /> P. Maintain all temporary and permanent erosion and sediment control practices; and, <br /> 1500 - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.