My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-013
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
2010-2019
>
2011
>
2011-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 12:19:10 AM
Creation date
12/16/2011 12:23:12 PM
Metadata
Fields
Template:
General
Document
Ordinance 2011-013
General - Type
Ordinance 2011-013
Category
Ordinance 2011-013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance <br /> Q. Removal of sediment from streets at the end of each day <br /> Subd. 4 Plan Content. The Erosion and Sediment Control Plan content shall include the <br /> following unless waived by the PWD: <br /> A. Contact information for the Permittee; <br /> B. Address of site where the land disturbing activity is proposed; <br /> C. Signature(s) of the owner(s) of the site or an authorized representative; <br /> D. Project description including the nature and purpose of the land disturbing activity <br /> and the amount of grading involved; <br /> E. Phasing of construction and timeline; <br /> F. Existing and proposed site conditions, including topography, vegetation, and <br /> drainage; <br /> G. Adjacent areas, neighboring streams, lakes, wetlands, residential areas, roads, etc., <br /> which might be affected by the land disturbing activity; <br /> H. Soil data including soil names, mapping units, erodibility; <br /> I. Critical erosion areas, which are areas on the site that have potential for serious <br /> erosion problems; <br /> J. Erosion and sediment control measures to be used on the site,both during and after <br /> the construction process; <br /> K. Temporary and Permanent stabilization to show how the site will be stabilized during <br /> and after construction(is completed), including specifications; <br /> L. Storm water management to show how storm runoff will be managed, including <br /> methods to be used if the development will result in increased peak rates or volume <br /> of runoff; <br /> M. Maintenance and schedule of regular inspections and repair of erosion and sediment <br /> control structures; and, <br /> N. Any calculations that were made for the design of such items as sediment basins, <br /> diversions, waterways, and other applicable practices. <br /> 1500 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.