Laserfiche WebLink
City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance <br /> Subd. 3 The location of areas not to be disturbed shall be identified with flags, stakes, <br /> signs, silt fence, etc. before construction begins. <br /> Subd. 4 Down-gradient sediment controls shall be in place before up-gradient land <br /> disturbing activity begins. <br /> Subd. 5 All storm drains,inlets and outfalls shall be protected until all sources of potential <br /> discharge are stabilized. <br /> Subd. 6 Temporary stockpiles shall have effective sediment control and can not be placed <br /> in surface waters or storm water conveyance systems. <br /> Subd. 7 Vehicle tracking from the site shall be minimized with the use of stone pads, <br /> concrete or steel wash racks, or equivalent systems. <br /> Subd. 8 Street sweeping shall be used if BMPs are not adequate to prevent sediment from <br /> being tracked into the street. <br /> 1530.03 Responsibility. The Permittee shall be responsible for proper operation and maintenance of <br /> all stormwater pollution controls and soil stabilization measures in conformance with best <br /> management practices and with the maintenance requirements in the NPDES General Construction <br /> Permit. The Permittee is responsible for the operation and maintenance of temporary erosion at the <br /> site. The Permittee is responsible until another Permittee has assumed control over all areas of the <br /> site that have not been finally stabilized or the site has undergone final stabilization,and has received <br /> an approved Certificate of Completion. The Permittee is responsible for maintenance,clean-up and <br /> all damages caused by flooding of the site or surrounding area due to in-place erosion or sediment <br /> control. <br /> Section 1540—Enforcement <br /> 1540.01 Erosion and Sediment Control Permit Enforcement. If the PWD determines that <br /> erosion and sedimentation control is not being implemented or maintained according to the <br /> approved Plan,the Permittee will be notified and provided with a list of corrective work to be <br /> performed. Notification may be given by personal delivery upon the Permittee, or an officer, <br /> partner, manager or designated representative of the Permittee, or by e-mail or facsimile by <br /> sending such notice to the e-mail address or facsimile number provided by the Permittee.Upon <br /> the receipt of a Non-Compliance Notice from the PWD,the Permittee shall undertake a <br /> corrective action. <br /> Subd. 1 Types of Corrective Actions. <br /> A. Violations Contained on the Construction Site. Permittee shall complete clean-up <br /> and restoration within forty-eight (48) hours of receipt of the Non-Compliance <br /> Notice. <br /> B. Violation Impacting Adjoining Property. Permittee shall develop and complete a <br /> clean-up and restoration plan within forty-eight(48)hours of receipt of a Non- <br /> 1500 - 9 <br />