My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-013
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
2010-2019
>
2011
>
2011-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 12:19:10 AM
Creation date
12/16/2011 12:23:12 PM
Metadata
Fields
Template:
General
Document
Ordinance 2011-013
General - Type
Ordinance 2011-013
Category
Ordinance 2011-013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance <br /> 1520.02 Review of Permit Application <br /> Subd. 1 General. The PWD shall review the Erosion and Sediment Control Plan to ensure <br /> compliance with the erosion and sediment control practice specifications and erosion and <br /> sediment control practices. <br /> Subd. 2 Permit Approval. If the PWD determines that the Erosion and Sediment Control <br /> Plan meets the requirements of this ordinance, the PWD shall issue a permit, valid for a <br /> specified period of time that authorizes the land disturbance activity contingent on the <br /> implementation and completion of the Erosion and Sediment Control Plan. <br /> Subd. 3 Permit Denial. If the PWD determines that the Erosion and Sediment Control <br /> Plan does not meet the requirements of this article,the PWD shall not issue a permit for the <br /> land disturbance activity. The Erosion and Sediment Control Plan must be resubmitted for <br /> approval before the land disturbance activity begins. No land use and building permits shall <br /> be issued until the Permittee has an approved Erosion and Sediment Control Plan. <br /> 1520.03 Escrow Requirement. After approval of an Erosion and Sediment Control Plan,the PWD <br /> may require the Permittee to escrow a sum of money sufficient to ensure the installation,completion, <br /> maintenance,inspection,and enforcement of the Erosion and Sediment Control Plan and practices. <br /> Escrow amounts shall be set by Ordinance in the City fee schedule. Upon project completion,the <br /> remaining escrow shall be returned to the Permittee. <br /> 1520.04 Modification of Plan. An approved Erosion and Sediment Control Plan may be modified <br /> upon submission of an application for modification to the PWD and subsequent approval by the <br /> PWD. In reviewing such application,the PWD may require additional reports and data. <br /> Section 1530—Implementation and Maintenance <br /> 1530.01 Implementation and Maintenance of Plan. All storm water pollution controls noted on the <br /> approved Erosion and Sediment Control Plan shall be installed before commencing the land <br /> disturbing activity and shall not be removed without PWD approval or approval of a Certificate of <br /> Completion. Noncompliance with the Erosion and Sediment Control Plan shall constitute grounds <br /> for an order from the PWD to halt all construction. <br /> 1530.02 Implementation. The plan implementation shall incorporate the following: <br /> Subd. 1 Existing vegetation shall be retained whenever feasible. <br /> Subd. 2 Land shall be disturbed in increments of workable size such that adequate erosion <br /> and sediment control can be provided and maintained as construction progresses. The area <br /> exposed shall be stabilized in conformance with best management practices and with the <br /> maintenance requirements in the NPDES General Construction Permit. Soil stabilization <br /> measures should be selected to be appropriate for the time of year, site conditions, and <br /> estimated duration of use. <br /> 1500 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.