My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-21-11-WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2011
>
11-21-11-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 12:09:31 AM
Creation date
1/11/2012 11:21:26 AM
Metadata
Fields
Template:
General
Document
11-21-11 Worksession Minutes
General - Type
11-21-11 Worksession Minutes
Category
11-21-11 Worksession Minutes
Date
11/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION—NOVEMBER 21, 2011 9 <br /> Councilmember Holden stated that she agrees with Councilmember Holmes' concerns. <br /> After some discussion, Council consensus was to request a meeting with CTV <br /> representatives,New Brighton cable personnel, and City staff to resolve the sound issues. <br /> • Water Meter Upgrades ($175,000 - 2012) <br /> Director Maurer explained that he came to this figure by combining what was not spent <br /> in 2011 with the 2012 funds. He explained that based on Council comments in previous <br /> discussions, he has put together a "laundry list" of things that need to be done. He is <br /> currently working on the overall plan and will bring it to Council once it's finalized. <br /> • Install SCADA($200,000 - 2014) <br /> Director Maurer explained that he moved this item to 2014 but believes that by that point <br /> in time it will no longer be needed as Public Works has figured out a different way to <br /> accomplish SCADA a lot cheaper. Also, he stated there are aspects of SCADA the City <br /> would not utilize. Another factor is that technology is changing daily. <br /> • Lift Station Reconstruction($410,000 - 2013) <br /> Director Maurer stated that he moved the lift station reconstruction from 2014 to 2013. <br /> • 2011 Seal Coating Monies Moved to 2012 ($215,000 - 2012) <br /> Director Maurer explained that there was money in the CIP for this item in 2011 and <br /> 2012 but he didn't feel comfortable spending it in 2011 because he wanted time to get the <br /> streets re-rated. These monies will do two years' worth of work in one year. <br /> • 2013 Mill and Overlay Removed—Crack Seal and Seal Coating Added($140,000 - 2013) <br /> Director Maurer stated that these monies were for the Chatham area but he does not <br /> believe the condition of the road is such that the City should assess the property owners. <br /> He added that he would like to get another "cycle" out of this road and then reclaim it at <br /> some point rather than doing an overlay. <br /> • 2014 Crack Seal and Seal Coating ($145,000 - 2014) <br /> Director Maurer explained that he had added $10,000 to this item to ensure sufficient <br /> funds based on a 2.5 percent inflation rate. <br /> • Ridgewood Asbury—2013 PMP ($1,534,000 - 2013) <br /> Director Maurer stated this project is in the Edgewater neighborhood where there have <br /> been frequent water main breaks. This will rebuild the roads and replace the water mains. <br /> He also explained that he reviewed 2010 and 2011 CIP's per foot costs for this type of <br /> project to determine the proposed amount. <br />
The URL can be used to link to this page
Your browser does not support the video tag.