My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-07-12-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2012
>
03-07-12-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2024 6:59:49 AM
Creation date
2/28/2012 2:04:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lot 2 maintains the opportunity for a gateway entry feature, additional outdoor seating, or <br /> gathering space, and an overall site plan that meets the requirements of the Zoning Code and <br /> forwards the vision of the Guiding Plan for the B-2 District. <br /> Because the site is not being fully redeveloped, but rather re-used, other principles of the <br /> Guiding Plan that relate to this site are not as clearly addressed. For example, it is not <br /> possible to realign the access drives towards a new intersection to accommodate a traffic <br /> light, because of the placement of the existing building. <br /> While multiple-family housing has been identified as an appropriate use in the B-2 District, <br /> boarding houses have not been contemplated. Physically the two uses have much in <br /> common, and both offer specific impacts on traffic patterns and parking. The impacts are <br /> magnified when compared with the previous student housing use. When Arden Hall was <br /> operational, Northwestern College provided shuttle trips several times a day to and from <br /> campus reducing trip generation, parking permits limiting parking demand, on-campus meal <br /> plans were provided, as was on-site food service, none of which is the case with the current <br /> proposal. Traffic generated from this site will certainly be greater as a 153-unit single room <br /> occupancy building than that of assisted senior housing or as student housing. <br /> 5. Traffic <br /> According to the traffic report submitted by the applicant, the proposed use would generate <br /> approximately 75 percent of the trip generation as the former Holiday Inn when it was fully <br /> functional. While not contemplated by the traffic report, it is anticipated that the trip <br /> generation would be greater than when the site operated as student housing, because NWC <br /> limited trips to the site by provided a shuttle service several times a day and limited the <br /> number of parking permits that were given out to students who lived at the facility. <br /> Furthermore, the traffic report does not contemplate the reuse of the existing restaurant <br /> facility, which could have a major impact on traffic to and from the site. <br /> The impact of Lot 1 alone is not the only variable to be considered. With the potential <br /> development of Lot 2, the City must consider the overall traffic impacts of the site as a <br /> whole. The report indicates that the Holiday Inn generated approximately 1,338 trips per day <br /> when it was fully operational. The traffic report contemplates five different possible land <br /> uses for Lot 2. The total trip generation on both parcels ranges widely from 1,360 trips per <br /> day with Lot 2 being utilized as a bank, up to 2,486 trips per day with Lot 2 being used as a <br /> fast food restaurant with drive-thru. This range is worrisome in that the City does not <br /> currently have a mechanism in place to control the number of trips once Lot 1 is developed. <br /> City of Arden Hills <br /> Planning Commission Meeting for.March 7, 2012 <br /> P:IPlanningIPlanning Cases12012112-002-Holiday Inn Plat and PUD(Pending)103-07-12-PC Report-1201 County Road E PUD.docx <br /> Page 9 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.