My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-07-12-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2012
>
03-07-12-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2024 6:59:49 AM
Creation date
2/28/2012 2:04:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
important to consider how the change would affect the entire zone instead of one specific <br /> property. If approved as proposed, boarding houses could, in theory, be a permitted use <br /> through a PUD process on any property in the B-2 Zone. However, the ordinance <br /> amendment could require that in order for a boarding house use to be approved, it would <br /> have to be located in an existing hotel/motel use within the district. This regulation could <br /> effectively limit this type of use to the proposed property. <br /> 2. Zoning Regulations <br /> This application is unique because the request is regarding the use of a building and site that <br /> are already developed. The typical evaluation as to whether or not the proposed plan meets <br /> the minimum requirements of the Zoning Code is more difficult given that there are certain <br /> aspects of the site that cannot reasonably be altered, such as the setbacks of the building. <br /> That being said there are certain reasonable improvements that can be required for the <br /> property given the nature of the PUD process and the City's broad discretion when reviewing <br /> requests for amendments to the Zoning Code. <br /> Lot 2 has been presented as a conceptual site plan. The conceptual site plan shown does not <br /> meet the minimum requirements of the B-2 District in terms of site design; however, at the <br /> time Lot 2 is actually developed, an approved Master and Final PUD will be necessary to <br /> evaluate the details of the development plan. <br /> Section 1320.06—District Requirements Chart <br /> A. Lot Size, Building Coverage, and Landscaping -Exceeds requirements: <br /> Building o Building Landscaping o <br /> Lot Size Coverage(st Coverage Coverage(sfl Landscaping <br /> Lot 1 -Holiday Inn Site 260,716 56,369 21.62% 78,596 30.15% <br /> Lot 2-Conceptual 82,827 9,500 11.47% 24,955 30.13% <br /> Total 343,543 65,869 19.17% 112,558 32.76% <br /> B. Setbacks -Meets requirements: <br /> The minimum setbacks in the B2 District are 20 feet in the front and rear and 10 feet in <br /> the side yards. The existing building exceeds the minimum setbacks for this District. <br /> The conceptual building shown on Lot 2 meets the minimum setbacks. This indicates <br /> that it is possible for the property to comply with setbacks when it is ultimately <br /> developed; however,the exact placement of the building on Lot 2 will be determined by a <br /> City of Arden Hills <br /> Planning Commission Meeting for March 7, 2012 <br /> P:I Planning)Planning CasesU012112-002-Holiday Inn Plat and PUD(Pending)103-07-12-PC Report-1201 County Road E PUD.docx <br /> Page 5 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.