My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-12 Joint WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2012
>
01-17-12 Joint WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2024 4:56:42 PM
Creation date
2/28/2012 4:10:02 PM
Metadata
Fields
Template:
General
Document
1-17-12 Joint WS
General - Type
1-17-12 Joint WS
Category
1-17-12 Joint WS
Date
1/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS JOINT COUNCIL WORK SESSION—JANUARY 17, 2012 4 <br /> Parking lot(curb/gutter and pavement) 50,000 <br /> Half court basketball area(no basketball standard) 15,000 <br /> Tree play area 35,000 <br /> Interior concrete paths 22,000 <br /> Exterior concrete path to Old Hwy 10 10,000 <br /> Landscaping(shade, ornamental, coniferous trees &turf establishment) 38,000 <br /> 18"play area curbing 11,500 <br /> Mobilization 15,000 <br /> Estimated Total Construction $ 317,500 <br /> Engineering 55,500 <br /> Construction Contingency 25,000 <br /> Estimated Bid Project Cost 398,000 <br /> MSA FUNDABLE ITEMS <br /> Bituminous (8') trail from Glenview to Old Highway 10 $ 18,000 <br /> Bituminous (8') trail adjacent to park along Old Highway 10 13,000 <br /> Total MSA Fundable 31,000 <br /> STATE CONTRACT ITEM (including installation) <br /> Play structure and swing set 45,000-60,000 <br /> Half court basketball (standard only) 3,750 <br /> Picnic shelter(16' x 16') 24,000-30,000 <br /> Furnishings (picnic tables, bike racks, trash receptacles) 12,500 <br /> Foot bridge 15,000 <br /> Total State Contract Purchases $100,250-121,250 <br /> SUMMARY OF ESTIMATED COSTS <br /> Construction bid $ 317,500 <br /> Engineering 55,500 <br /> Construction contingency 25,000 <br /> MSA fundable 31,000 <br /> State contract items 100,250-121,250 <br /> Total project cost $529,250-550,250 <br /> Councilmember Holden asked if it makes sense to do all the landscaping at the same time. <br /> Councilmember Tamble stated that he would recommend getting all the foundation items <br /> completed first and look at what can be added in the future without complications. <br /> Councilmembers Holmes and Holden questioned the amount of concrete walkways. <br /> After some discussion, Council directed staff to proceed with the bidding process, but to remove <br /> the trail adjacent to the park along Old Highway 10, to remove the tree play area, and to replace <br /> the foot bridge with a culvert at grade. Public Works Director Maurer stated that he will minimize <br /> the concrete bid and request an alternate bid on a square yard basis. He also added that <br />
The URL can be used to link to this page
Your browser does not support the video tag.