My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-12-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2012
>
05-09-12-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 12:16:40 AM
Creation date
5/8/2012 8:37:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
classroom components and Bethel subsequently requested an extension to continue using the <br /> temporary classrooms. <br /> Planning Case No.: 09-006 was submitted and approved by the Council resulting in permission to <br /> extend use of the classrooms until Oct 31,2012. <br /> The Wellness Center will be constructed partially on the site of the existing temporary <br /> classrooms. Until phase 1 of the new Wellness Center is completed and the new classrooms are <br /> placed on line,Bethel has a need to replace the existing temporaries. Our request includes the <br /> following specific items: <br /> l. Installation of two new temporary classrooms in the parking lot area north of the <br /> Community Life Center. This allows for ADA accessibility and proximity to utilities and <br /> restrooms. Each classroom would be approximately 850 fe which is identical to the <br /> existing temporaries. In order to replace the remaining two temporaries lost during <br /> construction,we are also remodeling the first floor of the Hagstrom building to include <br /> classroom spaces. <br /> 2. Removal of the two temporary classrooms on the west side of the existing temporary <br /> classroom modular,since these units are directly located in the phase 1 project and <br /> material laydown areas. <br /> 3. Permission to continue use of the remaining two temporary classrooms on the east side of <br /> the existing temporary modular. During phase 1 construction,this area would serve as <br /> the office and meeting space for the contractor which provides construction set-up saving <br /> to Bethel. After phase Iconstruction,we request to return these two classrooms to <br /> academic use until the phase 2 construction begins. At that point the units would be <br /> removed. <br /> 4. Permission to use the new temporary classrooms identified in#1 until phase two of the <br /> Wellness Center is completed. The new phase 2 classrooms would then offset the need <br /> for all temporaries. <br /> The need to continue use of temporary classrooms in this limited manner is driven by the findings <br /> of our campus master planning process. The consultant's reports indicate a serious shortage of <br /> classrooms to serve our current students and this is certainly validated by our own experience. In <br /> addition,because of other campus needs,we expect that our next major academic expansion,a <br /> new science building, is likely to be in the 10-15 year time frame. Since our academic Science <br /> departments are a key strength of our offerings at Bethel,we will need to develop some interim <br /> science spaces which carry Bethel forward until the new science building is constructed. This of <br /> course puts even more pressure on our existing classrooms resulting in this sequence of requests <br /> to continue temporary classroom use. <br /> The attached documents provide background information related specifically to the existing and <br /> proposed temporary classrooms. <br /> Attachment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.